Country, Site | Tabanan Regency, Bali Province, Indonesia |
---|---|
Project Outline | The objective of the Survey is to verify the operation system of electric power that local residents can maintain and manage in a self-sustaining way by installation of flume-adapted small hydroelectric generator and implementing technical training for local residents in Jatiluwih Village, Tabanan Regency, Bali. |
Category | B |
Reason of Categorization |
The project is not likely to have significant adverse impact on the environment under the JICA guidelines for environmental and social considerations (April 2010) in terms of its sectors, charactoristics adn areas. |
Latest Result of Monitoring |
- |
Past Results of Monitoring |
- |
Remarks | - |
scroll