Country, Site | Jatiluwih Village, Tabanan, Bali, Indonesia |
---|---|
Project Outline | The objective of the survey is to comfirm the operation system of electric power that local residents can maintain and manage in a self-sustaining way by installation of flume-adapted small hydroelectoric generator and implementing technical training for local residents in Tabanan Regency,Bali |
Category | B |
Reason of Categorization |
The project is not likely to have significant adverse impact on the environment under the JICA guidelines for environmental and social considerations (April 2010) in terms of its sectors, charactoristics adn areas. |
Latest Result of Monitoring |
- |
Past Results of Monitoring |
- |
Remarks | - |
scroll