Country, Site | The Republic of the Philippines, Pasig-Marikina River Basin and Cagayan River Basin |
---|---|
Project Outline | The objective of the Project is to update the existing Flood Control M/Ps and conduct Pre-Feasibility Study (Pre-F/S) in the Target River Basins and strengthen the existing Flood Control Management System among the related agencies through the preliminary flood risk assessment, updating M/Ps are formulated to contribute in reducing flood risk, Pre-F/S for priority project(s), and Promotion of basin-wide collaboration with concerned agencies and/or local government units through the existing coordinating body in the Target River Basins. |
Category | B |
Reason of Categorization |
The project is not likely to have significant adverse impact on the environment under the JICA guidelines for environmental and social considerations (April 2010) in terms of its sectors, characteristics and areas. |
Latest Result of Monitoring |
- |
Past Results of Monitoring |
- |
Remarks | - |
scroll