November 29, 2019
signing ceremony
On 28 November, the Japan International Cooperation Agency (JICA) signed a Record of Discussions with the Government of the Republic of Cuba in Havana for the Project on Electricity Sector Master Plan Study for Development of Renewable Energy, a technical cooperation for development planning.
The government of Cuba has set a policy target of increasing the renewable energy rate (the share of renewable power generated by renewable energy relative to the total electricity generated) from current 5% to 24% by 2030. The project will formulate a master plan for renewable energy development by 2030 and contribute to the enhancement of renewable energy utilization in Cuba
The detail of the project is as follows:
Country | Republic of Cuba |
---|---|
Project title | Project on Electricity Sector Master Plan Study for Development of Renewable Energy |
Planned implementation period | 24 months |
Executing agency | Electric Union of Cuba (UNE) |
Target region | Nationwide |
Specific project details (provisional) | - Identify the renewable energy potential of Cuba. - Propose renewable energy projects to be incorporated by 2030 and the necessary measures required to ensure operational stability of the NES with their integration. - Develop an Energy Development Master Plan by 2030 which includes a list of priority projects. - Assist UNE in improving technical capacity to update the Energy Development Master Plan as needed. |