Project Type
Technical Cooperation, On-going (2013-2017)
Project Summary
Objective:
- 1 . To improve the capacities of BWDB on Embankment Engineering in terms of Design, Construction and Operation & Maintenance methods
- 2 . To achieve water-related disaster risk reduction through proper management of the infrastructures
Outputs:
- 1 . Design for sustainable river embankment is introduced
- 2 . Construction method and procedure of river embankment is improved
- 3 . Operation and Maintenance system for the river infrastructures is ensured
Project Site
Applicable for all over the country
R/D Signing Date
March 25, 2013
Commitment Amount
Lump Sum
Executing Agency
Bangladesh Water Development Board (BWDB)