2012-07-17
In order to carry out the PI activities, the site surveys are conducted to confirm the actual situation. In Wandue Phodrang, visited the pilot feeder (33kV) for the fault location, and identified problems based on the site survey in Lhuentse for the technical loss.
Checked an inspection route of BPC OM staff
The second presentation to report each progress activity was held afterwards.