1. Activities at central level

  1. Review governmental rules and regulations relevant to restoration of degraded ecosystems in conservation aeras.
  2. Identify useful techonologies for restoration including those developed with JICA's assistance.
  3. Review the existing technical guidelaine relevant to restoration.
  4. Examine potential financial resources including GERHAN, Reforestation Fund, Private investment, and donor assistance to be utilized for restoration.
  5. Prepare a draft of restoration guideline

2. Activities in the Project Sites

2-1. Restoration Plans in the Proejct Sites

  1. Organize working group(s) at each project site which are responsible for planning and implementation of restoration activities in the project sites.
  2. Identify the target areas for restoration activites in the project sites.
  3. Review the current restoration plans (if they are already formulated).
  4. Prepare draft restoration plans (if they are not yet formulated)
  5. Hold workshop(s) attended by stakeholders to discuss draft restoration plans.
  6. Review the restoraton plans as needed in the process of implementation.
  7. Make documents of the planning process.

2-2. Implementation of Restoration Activites

  1. Conduuct training for restoration to working groups.
  2. Implement the restoration activities in the project sites.
  3. Monitor, evaluate and review the restoraton activities

3. Achievement and Planning

Achievement in the fiscal 2010

PhotoJCC Meeting (July 2010)

(Output 0)

(1) Hold a Joint Coordinating Committee (JCC) Meeting (July 2010)

(2) Hold Project Meetings (July and November 2010 and March 2011)

(Output 1)

(1) Review governmental rules and regulations relevant to restoration of degraded ecosystems in conservation areas

(2) Review the existing technical guidelines relevant to restoration

(3) Make a cooperate agreement with Private Companies (PT. Yamaha Musik Indonesia,Sumitomo Forestry Co., Ltd.)

(Output 2)

(1) Selection of local consultants and make contracts with local consultants

(2) Implementation of restoration activities through local consultants in the project sites as follows:

  • Hold Inception Meeting (Explanation of planned activities to stake holders)
  • Identify the target areas for restoration and make maps
  • Organize working groups
  • Conducting base line survey
  • Formulation of Restoration Plan/Design
  • Holding Final Meeting

(3) Conducting Study Tours

Achievement in the fiscal 2011

PhotoTraining to the Working Group in the nursery (July 2011)

(Output 0)

(1) Hold a JCC Meeting (May 2011)

(2) Hold Project Meetings (May, September and December 2011 and March 2012)

(3) Hold the Restoration Seminar (January 2012)

(Output 1)

(1) Formulate a draft technical guideline for restoration

(2) Formulate a draft Field Guide on Restoration Plants

(Output 3)

(1) Selection of local consultants and make contracts with local consultants

(2) Implementation of restoration activities through local consultants in the project sites as follows:

  • Hold Inception Meeting (Explanation of planned activities to stake holders)
  • Conducting the training to the working group
  • Making Fire breaks and Bio-fens
  • Construction of nurseries/Production of seedlings
  • Land preparation for planting/ Planting/ Maintenance
  • Hold Final Meeting

(3) Construction of Working /Look Out Hut

(4) Conducting training of the forest fire control in the BromoTengger Semeru National Park (Collaboration with Sumitomo Forestry Co., Ltd.)

(5) Hold Planting Ceremony and CSR Planting in the Gunung Ciremai National Park (Collaboration wiht PT. Yamaha Musik Indonesia)

Achievement in the fiscal 2012

(Output 0)

(1) Hold a JCC Meeting (July 2012)

(2) Hold Project Meetings (July and November 2012 and January 2013)

(3) Hold the Restoration Seminar (January 2013)

(Output 1)

(1) Make a draft of the technical guideline for restoration

(2) Make a draft of the Field Guide on Restoration Plants

(3) Make an agreements of collaboration with research institutions and private companies (LIPI, PT. Asuransi MSIG Indonesia, PT. TS Tech Indonesia , Sumitomo Forestry Co., Ltd )

(Output 3)

(1) Selection and make contracts with Field Manager (FM) in each project site

(2) Implementation of restoration activities through FM in each project site

(3) Conducting the training of Restoration Plants to the working group (collaboration with LIPI)

(4) Conducting the training of nursery technics by the Short Term Expert

(5) Conducting training of the forest fire control in the BromoTengger Semeru National Park (Collaboration with Sumitomo Forestry Co., Ltd.)

(6) Hold Planting Ceremony and CSR Planting in the Gunung Ciremai National Park (Collaboration wiht PT. Yamaha Musik Indonesia)

(7) Hold Planting Ceremony and CSR Planting in the Gunung Merapi National Park (Collaboration wiht PT. TS Tech Indonesia)

(8) Conducting Study Tours

Achievement in the fiscal 2013

PhotoRestoration Seminar(February 2014))

(Output 0)

(1) Hold a JCC Meeting (May 2013)

(2) Hold Project Meetings (May and November 2013 and February 2014)

(3) Hold the Restoration Seminar(February 2014)

(Output 1)

(1) Make and publish the Process Guideline on Restoration in Conservation Areas (Tropical Mountain Rain Forest and Tropical Monsoon Forest)

(2) Make and publish the Technical Manual on Restoration in Conservation Areas (Tropical Mountain Rain Forest and Tropical Monsoon Forest)

(3) Make and publish the Field Guide on Restoration Plants (Indonesian)

(Output 3)

(1) Implementation of restoration activities through FM in each project site

(2) Conducting the field survey of Restoration Plants in the project sites (collaboration with LIPI)

(3) Conducting the training of seedlings production from seeds by the Short Term Expert

(4) Conducting training of the forest fire control in the BromoTengger Semeru National Park (Collaboration with Sumitomo Forestry Co., Ltd.)

(5) Hold Planting Ceremony and CSR Planting in the Gunung Ciremai National Park (Collaboration wiht PT. Yamaha Musik Indonesia)

Achievement in the fiscal 2014 (planned)

(Output 0)

(1) Hold a JCC Meeting

(2) Hold Project Meetings

(3) Hold the Restoration Seminar

(Output 1)

(1) Make and publish the Process Guideline on Restoration in Conservation Areas (Mangrove Ecosystem )

(2) Make and publish the Technical Manual on Restoration in Conservation Areas (Mangrove Ecosystem )

(3) Revise and make the Field Guide on Restoration Plants (English)

(4) Make and publish the Technical Manual on seedlings production from seeds

(5) Examine potential of financial resources for the restoration through the "collaboration team"

(6) Dissemination of the Process Guideline and Technical Manual on Restoration to the other National Parks

(Output 3)

(1) Implementation of restoration activities through FM in each project site

(2) Conducting the training of seedlings production from seeds by the Short Term Expert

(3) Construction of Arboretum in the Sembilang National Park