2019-05-18
Having completion of the project in October 2019, the Terminal Evaluation was jointly conducted till 17 May 2019 by Japanese side and Nepalese side to examine achievement of the project's outputs etc.
The joint evaluation team member list and summary of evaluation result and recommendations are as follows.
Joint Terminal Evaluation Team:
Name | Post |
Mr. Sei Kondo | Director, Environmental Management Group, Grobal Environment Department, Japan International Cooperation Agency |
Mr. Keigo Tsushima | Program officer, Environmental Management Group, Grobal Environment Department, Japan International Cooperation Agency |
Prof. Yoshifumi Yasuoka | Research Supervisor, Japan Science & Technology Agency |
Dr. Tomohiro Teraminami | Department of International Affairs, Japan Science & Technology Agency, Tokyo |
Ms. Toshiko Shimada | IC Net Limited (Evaluation analysis consultant) |
Mr. Prem Krishna Shrestha | Ministry of Water Supply, Government of Nepal |
Dr. Sushil Bahadur Bajracharya | Institute of Engineering, Tribhuvan University |
Summary of evaluation result (Achievement of project purpose and outputs):
Project purpose | Management system on potable water resources - shallow and deep groundwater, and surface and rain water - is enhanced. | likely to be achieved by the end of the Project. |
Output 1 | Potable water resources situation, including water demand, consumption and supply in the Kathmandu Valley, is studied and future forecast is conducted. | Achieved |
Output 2 | Situation and sources of groundwater pollution is studied. | Achieved |
Output 3 | Microbiological situation of environmental water, such as groundwater, surface water, and rain water, in the Kathmandu Valley is studied. | will be achieved by the end of the Project |
Output 4 | Appropriate locally-fitted, compact and distributed (LCD) water treatment system for groundwater and surface water in the Kathmandu Valley is developed. | Achieved |
Output 5 | Social and economic evaluation of the LCD water treatment system installation in the Kathmandu Valley is studied. | will be achieved by the end of the Project (evaluation of coping cost as an economic impact indicator of LCD system will be completed by the end of the project) |
Output 6 | A task force (TF) to enhance the social implementation is organized. | will be achieved by the end of the Project (TF was established. Making an integrated water security map public is under consideration and it will be done by the end of the project) |
Recommendations to the project:
For remaining project period (till the end of October 2019)
After completion of the project
Responding to the evaluation result and recommendations made by the joint evaluation team, the project will discuss necessary actions such as making an action plan and clarification of sharing roles by each component.
The evaluation team visiting an LCD system in Thimi (Chapacho)
Evaluation meeting between the Eva. Team and the project team
Signing minutes of meeting in the 7th joint coordinating committee meeting