Country, Site | Iraq, Basrah Governorate |
---|---|
Project Outline | The objective of the Project is to strengthen and stabilize Iraq’s electric power system by rehabilitating the Unit #4 of the Hartha Power Station, located in Basrah. |
Category | B |
Reason of Categorization |
The project is not considered to be a large-scale thermal power generation project, is not located in a sensitive area, and has none of the sensitive characteristics under the JICA Guidelines for Environmental and Social Considerations (April, 2010), it is not likely to have significant adverse impact on the environment. |
Latest Result of Monitoring |
·Environmental Monitoring Form (EMoF) during Operation Phase (PDF/121KB) |
Past Results of Monitoring |
- |
Remarks | - |