Country, Site | Sidi Salem Dam and the downstream of the Mejerda River, Republic of Tunisia |
---|---|
Project Outline | The objective of the Project is to secure the storage capacity of Sidi Salem Dam for water use including drinking and irrigation water as well as flood control, by constructing infrastructure against sedimentation. |
Category | B |
Reason of Categorization |
The project is not considered to be a large-scale river/erosion control project, is not located in a sensitive area, and has none of the sensitive characteristics under the "JICA Guidelines for Environmental and Social Considerations (April 2010)". It is not likely to have a significant adverse impact on the environment. |
Latest Result of Monitoring |
- |
Past Results of Monitoring |
- |
Remarks | - |
scroll