Japan International Cooperation Agency
Share
  • 日本語
  • English
  • Français
  • Espanol
  • Home
  • About JICA
  • News & Features
  • Countries & Regions
  • Our Work
  • Publications
  • Investor Relations

Ex-Post Evaluation

POST-EVALUATION REPORTS IN FISCAL 1998

POST-EVALUATION by OECF(PDF)
  • Purpose of Post-Evaluation
  • Post-Evaluation Work of OECF
  • Post-Evaluation in the Context of the Project Cycle
  • Types of Post-evaluation
  • Selection of Projects for Post-evaluation
  • Points to be Considered in Post-evaluation
(PDF/49KB)
CONTENTS OF THIS REPORT(PDF)
Evaluation reports included in this report
Summary of the post-evaluation report of 1997
Summaries of individual evaluation reports
Status of Cooperation with Japan International Cooperation
(PDF/31KB)
DETAILED EVALUATION(PDF)
  1. IndonesiaLangkeme Irrigation Project Research Report
"How Maintenance for Irrigation Projects Should Adapt to Changes in the Local Community"
~Taking the Lankeme Irrigation Project in Indonesia as a Case Study~ (Masami Mizuno, Rie Makita,Katsuhiko Nakadate)
(PDF/860KB)
  2. Costa RicaMiraballes Geothermal Project(PDF/1,154KB)
  3. Syrian ArabBanias Power Station Extension Project(PDF/1,363KB)
  4. Thailand(1) Railway Cars Procurement Project
(2) Train Dispatcher Telephone Improvement & Passenger Coaches Project
(3) PassengerCoaches Procurement Project (II)
(4) Projectfor State Railway of Thailand
(PDF/930KB)
  5. Thailand(1) Power Distribution Systems Reinforcement Project(IV-2)
(2) Power Distribution Systems Reinforcement Project (IV-3)
(3) Normal Rural Electrification Project (II)
(4) VillageElectrification Project (III)
(PDF/758KB)
  6. ThailandBangkok Water Supply Improvement Project
(1) (Tunnel Rehabilitation)
(2) (Stage II-Phase 1B)
(PDF/445KB)
  7. China(1) Lianyungang Port Expansion Project (I)-(VI)
(2) Zhengzhou-Baoji Railway Electrification Project (I)-(V)
(3) Baoji-Zhongwei Railway Construction Project (I)-(IV)
(PDF/1,086KB)
  8. ChinaWuhan Tian He Airport Construction Project(PDF/702KB)
  9. PhilippinesPalinpinon Geothermal Generation Plant Project (II), (II-2)
Research Report
"Financial Characteristics of Government-owned or Controlled Corporations in the Philippines" (Akihiro Nakagome)
(PDF/928KB)
THIRD-PARTY EVALUATION(PDF)
  1. PhilippinesProvincial Cities Water Supply projects (I) and (II)The International Development Journal Co.,Ltd.(PDF/705KB)
DESK EVALUATION(PDF)
  1. IndiaTamil Nadu State Micro Hydro Power Stations Construction Project(PDF/14KB)
  2. IndonesiaConstruction Equipment Reconditioning and Rehabilitation Project(PDF/14KB)
  3. IndonesiaScattered Diesel Plants & Distribution Network Project(PDF/14KB)
  4. ThailandSRT Signalling Improvement and Modernization Project Train Dispatcher Telephone Improvement & Passenger Coaches Procurement Project(PDF/14KB)
  5. ThailandDao Kanong-Klong Toey Port Expressway Project (Stage II)(PDF/15KB)
  6. ThailandSrirancha-Laem Chabang Railway Project(PDF/15KB)
  7. NepalUdaipur Cement Project(PDF/13KB)
  8. Pakistan500kV Multan-Guddu Substations Extension Project(PDF/13KB)
  9. Papua New GuineaYonki Hydroelectric Project(PDF/14KB)
10. MexicanLocomotive Reconstruction Project(PDF/13KB)

PAGE TOP

Copyright © Japan International Cooperation Agency