Country, Site | Rwanda,Kigali City |
---|---|
Project Outline | The objective of the Project is to increase the water volume to stabilize the water supply in Kigali City by improving water supply facilities such as the Nzove-Ntora transmission pipeline, pump equipment at the Nzove water treatment plant, and the Ntora reservoir station, thereby contribution to the improvement of the water supply situation and social services in the area. |
Category | B |
Reason of Categorization |
The project is not located in a sensitive area, nor has sensitive characteristics, nor falls into sensitive sectors under the JICA Guidelines for Environmental and Social Considerations (April, 2010)., and its potential adverse impacts on the environment are not likely to be significant. |
Latest Result of Monitoring |
·Result of Monitoring (2023Q3) (PDF/947KB) |
Past Results of Monitoring |
·Result of Monitoring (2021Q1)(PDF/4.5MB)
·Result of Monitoring (2021Q2)(PDF/10.2MB) ·Result of Monitoring (2021Q3)(PDF/5.4MB) ·Result of Monitoring (2021Q4)(PDF/5.2MB) ·Result of Monitoring (2022Q1)(PDF/5.0MB) ·Result of Monitoring (2022Q2)(PDF/5.3MB) ·Result of Monitoring (2022Q3)(PDF/6.2MB) ·Result of Monitoring (2022Q4)(PDF/6.3MB) ·Result of Monitoring (2023Q1)(PDF/4.8MB) ·Result of Monitoring (2023Q2)(PDF/2.4MB) |
Remarks | - |
scroll