Country, Site | The United Republic of Tanzania |
---|---|
Project Outline | The objective of the Project is to stabilize power supply through formulation of Transmission and Distribution System Master Plan for Dar es Salaam and reviewing of Power System Master Plan 2012(PSMP) for Tanzania. Sector: Electricity |
Category | B |
Reason of Categorization |
The project is not considered to be a large scale electricity project, is not located in the sensitive area, and has none of the sensitive characteristics under the JICA guidelines for environmental and social consideration(April 2010), it is not likely to have a significant adverse impact on the environment. |
Latest Result of Monitoring |
- |
Past Results of Monitoring |
- |
Remarks | - |