Country, Site | Afghanistan, Bamyan |
---|---|
Project Outline | The objective of the project is to enhance users' safety and to improve flight operation at the existing Bamyan Airport through runway paving, construction of apron and passenger terminal building, provision of fire-fighting vehicle, snowplow and other equipment and facility for aircraft such as aviation radio. |
Category | B |
Reason of Categorization |
The project is not considered to be a large-scale airport, is not located in a sensitive area, and has none of the sensitive characteristics under the JICA guidelines for environmental and social considerations (2010). Thus, it is not likely to have significant adverse impact on the environment. |
Latest Result of Monitoring |
·Monitoring Result (Apr 2018) (PDF/2.19MB) |
Past Results of Monitoring |
- |
Remarks | - |
scroll