Country, Site | India, Madhya Pradesh |
---|---|
Project Outline | The objective of the Project is to ensure the stable operation of the transmission system and realize the reliable transmission of power increased as a result of the development of power generation capacity in Madhya Pradesh State by developing and expanding new and existing power transmission lines and substations across the state. |
Category | B |
Reason of Categorization |
The project is not located in a sensitive area, nor has sensitive characteristics, nor falls into sensitive sectors under the JICA guidelines for environmental and social considerations (April 2010), and its potential adverse impacts on the environment are not likely to be significant. |
Latest Result of Monitoring |
- |
Past Results of Monitoring |
- |
Remarks | - |