Country, Site | Sekong and Attapeu provinces |
---|---|
Project Outline | The objective of the Project is to increase power generation from renewable energy sources in Lao PDR through the construction and operation of a wind farm and related facilities in Sekong and Attapeu Provinces, thereby contributing to alleviating power crunches and reducing greenhouse gas emissions in the neighboring country. |
Category | A |
Reason of Categorization |
The Project falls into the categories of “sensitive characteristics” and “sensitive areas” as per the JICA Guidelines for Environmental and Social Considerations of January 2022. |
Latest Result of Monitoring |
·Result of Monitoring (2024Q3) (PDF/2.3MB) |
Past Results of Monitoring |
·Result of Monitoring (2023Q1Q2)(PDF/7.3MB)
·Result of Monitoring (2023Q3)(PDF/9.3MB) ·Result of Monitoring (2023Q4)(PDF/2.3MB) ·Result of Monitoring (2024Q1)(PDF/2.5MB) ·Result of Monitoring (2024Q2)(PDF/2.6MB) |
Remarks | - |
scroll