| Country, Site | The Republic of the Philippines, Metro Manila |
|---|---|
| Project Outline | The objective of the Project is to mitigate flood damages in Metro Manila caused by channel overflow of the Pasig-Marikina River by implementing river channel improvement works together with non-structural measures in consideration with the flood risk management, and thereby contributing to the sustainable urban economic development of the said region. |
| Category | A |
| Reason of Categorization |
The project falls into the River sector (located in a sensitive area and is likely to have significant adverse impact due to its characteristic) under the JICA Guidelines for Environmental and Social Considerations (April, 2010) |
| Latest Result of Monitoring |
·Result of Monitoring (2025Q3) (PDF/18.3MB) |
| Past Results of Monitoring |
·Result of Monitoring (2022Q4)(PDF/10.6MB)
·Result of Monitoring (2023Q1)(PDF/1.8MB) ·Result of Monitoring (2023Q4)(PDF/2.6MB) ·Result of Monitoring (2024Q2)(PDF/15.3MB) ·Result of Monitoring (2024Q3)(PDF/28.7MB) ·Result of Monitoring (2025Q1)(PDF/6.2MB) ·Result of Monitoring (2025Q2)(PDF/15.8MB) |
| Remarks | - |