The Project for Swing Bridge Reconstruction

Country, Site Belize City
Project Outline The objective of the Project is strengthening infrastructure in the event of a disaster and improving the resilience of local people and the tourism industry, which is a major industry in the country by/through replace bridges located in places where there is a high risk of flood damage.
Category B
Reason of
Categorization
The project is not considered to be a large-scale Bridge Reconstruction project, is not located in a sensitive area, and has none of the sensitive characteristics under the JICA Guidelines for Environmental and Social Considerations (January, 2022), it is not likely to have significant adverse impact on the environment.