Country, Site | Arab Republic of Egypt |
---|---|
Project Outline | The objective of the Project is to recover power generation and improve reliability of power plants and stabilize power supply by renewing and refurbishing equipment and supplying spare parts,thereby contributing to economic and social development and alleviating climate change in Egypt. |
Category | B |
Reason of Categorization |
The project is not considered to be a large-scale thermal power project, is not located in a sensitive area, and has none of the sensitive characteristics under the JICA Guidelines for Environmental and Social Considerations (April, 2010), it is not likely to have significant adverse impact on the environment. |
Latest Result of Monitoring |
·Result of Monitoring (2023Q3) (PDF/598KB) |
Past Results of Monitoring |
·Result of Monitoring (2019Q1)(PDF/1.6MB)
·Result of Monitoring (2019Q2)(PDF/509KB) ·Result of Monitoring (2019Q3)(PDF/1.6MB) ·Result of Monitoring (2019Q4)(PDF/1.7MB) ·Result of Monitoring (2020Q1)(PDF/1.7MB) ·Result of Monitoring (2020Q2)(PDF/3.7MB) ·Result of Monitoring (2020Q3)(PDF/4.0MB) ·Result of Monitoring (2020Q4)(PDF/3.7MB) ·Result of Monitoring (2021Q1)(PDF/306KB) ·Result of Monitoring (2021Q2)(PDF/436KB) ·Result of Monitoring (2021Q3)(PDF/304KB) ·Result of Monitoring (2021Q4)(PDF/274KB) ·Result of Monitoring (2022Q1)(PDF/271KB) ·Result of Monitoring (2022Q2)(PDF/270KB) ·Result of Monitoring (2022Q3)(PDF/3.1MB) ·Result of Monitoring (2022Q4)(PDF/279KB) ·Result of Monitoring (2023Q1)(PDF/277KB) ·Result of Monitoring (2023Q2)(PDF/277KB) |
Remarks | - |
scroll