Japan International Cooperation Agency
Share
  • 日本語
  • English
  • Français
  • Espanol
  • Home
  • About JICA
  • News & Features
  • Countries & Regions
  • Our Work
  • Publications
  • Investor Relations

Information Disclosure under new Guidelines

Southeast Asia

Projects classified as Category A, B, or FI

  • (TCP) Technical Cooperation Project
  • (TCDP) Technical Cooperation for Development Planning
  • (L) ODA Loans / Private Sector Investment Finance
  • (GA) Grant Aid
  • (CP) Collaboration Program with the Private Sector for Disseminating Japanese Technology
  • (SSM-VS) Verification Survey with the Private Sector for Disseminating Japanese Technologies
  • (SSM-FS) Feasibility Survey with the Private Sector for Utilizing Japanese Technologies in ODA projects
  • (SDGs-FS/BOP-PS) Feasibility Survey for SDGs Business / Preparatory Survey for BOP Business
  • (SDGs-BMFS) SDGs Business Model Formulation Survey with the Private Sector
  • (SDGs-BVS) SDGs Business Verification Survey with the Private Sector
  • EIA: Environmental Impact Assessment
  • EPC: Environmental Permit Certificate
  • RAP: Resettlement Action Plan
  • IPP: Indigenous Peoples Plan

Please click on “Project Name” to view Past Results of Monitoring.

Cambodia

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
The Project for the Study on Strengthening Competitiveness and Development of Sihanoukville Port TCDP A ·・Final Report(July, 2012)(PDF/4.61MB)・ (PDF/4.62MB)
·M/M(Feb, 2011)(PDF/0.25MB) (PDF/257KB)
·Environmental and Social Considerations in Detailed Planning Survey(PDF/0.62MB) (PDF/617KB)
- - -
National Road No.5 Improvement Project (Battambang-Sri Sophorn Section) L A - ·EIA (Oct. 15, 2012) (PDF/10.3MB)
·RAP(Oct. 10, 2012) (PDF/21.7MB) (PDF/21.7MB)
·Environmental Review (PDF/81KB)
·Result of Monitoring (EIA)_March 2020 (PDF/975KB)
National Road No.5 Improvement Project (Prek Kdam - Thlea Ma'am Section) L A ·Preparatory Survey (Nov. 2013)
·EIA (Nov. 27, 2013) (PDF/24.5MB)
·RAP (Nov. 27, 2013) (PDF/8.50MB)
·EPC (Nov. 27, 2013) (PDF/621KB)
·Environmental Review (PDF/182KB)
·Result of Monitoring (EIA)_June 2019 (PDF/704KB) (PDF/703KB)
National Road No.5 Improvement Project (Thlea Ma'Am-Battambang Section and Sri Sophorn-Poipet Section) L A ·Final Report on Preparatory Survey (PDF/80.1MB)
·EIA (Oct. 24, 2014) (PDF/38.4MB)
·RAP (Oct. 10, 2014) (PDF/81,9MB)
·Environmental Review (PDF/193KB)
-
Phnom Penh Autonomous New Port Container Terminal's Special Economic Zone and Associated Facilities Construction Project L A - - - -
Phnom Penh Urban Railway Development Project L A - - - -
Phnom Penh – Bavet Expressway Development Project L A - - - -
The Study on Drainage and Sewerage Improvement Project In Phnom Penh Metropolitan Area TCDP B ·Environmental and Social Considerations in Detailed Planning Survey (PDF/693KB)
·R/D (PDF/2.37MB)
·N/A
·N/A
-
Phnom Penh City Transmission and Distribution System Expansion Project L B ·Final Report on Preparatory Survey
- ·Environmental Review (PDF/172KB)
-
Phnom Penh City Transmission and Distribution System Expansion Project (Phase 2) L B ·Final Report on Preparatory Survey
- ·Environmental Review (PDF/133KB)
-
Rice Husk Power Generation Project in Cambodia L B - - - -
Siem Reap Water Supply Expansion Project L B ·Preparantry Survey Final Report2(in japanese)
·EIA(Jan.15.2018) (PDF/4.01MB)
·Result in Review(in Japanese)
-
Sihanoukville Port New Container Terminal Development Project L B ·Preparatory Survey (Jan. 2017)
- - -
Southwest Phnom Penh Irrigation and Drainage System Rehabilitation and Improvement Project L B ·Preparatory Survey Vol.1 (PDF/18.4MB)
·Preparatory Survey Vol.2 (PDF/20.6MB)
·Preparatory Survey Vol.3 (PDF/20.5MB)
·Preparatory Survey Vol.4 (PDF/24.4MB)
·Preparatory Survey Vol.5 (PDF/33.1MB)
·Preparatory Survey Vol.6 (PDF/25.4MB)
·Preparatory Survey Vol.7 (PDF/22.5MB)
·Preparatory Survey Vol.8 (PDF/7.14MB)
- ·Result of review (PDF/181KB)
-
Construction and Rehabilitation of Small Hydropower Plants in Rattanakiri Province GA B - - - -
Flood Disaster Rehabilitation and Mitigation GA B ·Preparatory survey report on the project for flood disaster rehabilitation and mitigation in Kingdom of Cambodia.
·RAPAbbreviated Resettlement Action Plan
- ·Result of Environmental and Social Impact (PDF/201KB)
Southern Economic Corridor Distribution Expansion Project GA B - - - -
The Project for Expansion of Water Supply System in Kampot GA B ·Preparatory Survey(PDF/6.04MB)
·Appendix(PDF/9.13MB)
·N/A
·Environmental Review (In Japanese)(PDF/289.9KB)
·Environmental_Monitoring_Resolt_(Aug-2017) (PDF/10.2MB)
The Project for Expansion of Water Supply Systems in Kampong Cham and Battambang GA B ·Preparatory Survey (PDF/4.57MB)
·Appendix 1(PDF/3.71MB)
·Appendix 2(PDF/3.91MB)
·Appendix 3(PDF/3.72MB)
·Appendix 4(PDF/3.99MB)
·Appendix 5(PDF/3.27MB)
·Appendix 6(PDF/3.05MB)
·Appendix 7(PDF/3.59MB)
·N/A
·Environmental Review (In Japanese)(PDF/127.2KB)
-
The Project for Expansion of Water Supply Systems in Pursat and Svay Rieng GA B - - - -
The Project for Flood Protection and Drainage Improvement in Phnom Penh Capital City (Phase IV) GA B ·Preparatory survey report on the project for flood protection and drainage improvement in Phnom Penh (phase IV) in the Kingdom of Cambodia.
·RAPAbbreviated Resettlement Action Plan
- -
The Project for Rehabilitation of the Chroy Changwar Bridge GA B ·Preparatory Survey (Mar. 1, 2016)(in Japanese)(PDF/10.3MB)
·N/A
- -
The Project for Sewerage System Development in the Phnom Penh Capital City GA B - - - -
The Project for Urgent Replacement of Bridges in Flood-Prone Areas GA B - - ·Ex-ante evaluation paper (Japanese) (PDF/278KB)
-
The Project for Water Supply Expansion Project in Ta Khmau GA B - - - -
the Project for Expansion of Water Supply System in Kampot GA B ·Preparatory Survey(PDF/6.04MB)
·N/A
·Environmental Review (In Japanese)(PDF/289.9KB)
·Environmental_Monitoring_Resolt_(Aug-2018) (PDF/3.07MB)
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Improvement of Sanitation and Living Condition using Amphibious Excavator SSM-VS B - ·N/A
·Environmental Review (In Japanese) (PDF/243KB)
-
Feasibility Survey for Promoting the Reservoirs for Irrigation Water SSM-FS B - - - -
Feasibility Survey for Sludge Composting Utilizing Organic Waste Processing Technoligy SSM-FS B - - - -
Feasibility Survey for the Development of Irrigation and Agricultural Facilities by the STEIN Soil Hardening SSM-FS B ·Final Report (in Japanese)(PDF/5.29MB)
- - -
Feasibility survey for next-generation small-size medical waste incinerator for medical waste treatment SSM-FS B ·Final Report (in Japanese)(PDF/1.72MB)
- ·N/A
·N/A
Feasibility survey for utilizing water hyacinth as an ethanol in Cambodia SSM-FS B - ·N/A
·N/A
·N/A

Indonesia

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Capacity Expansion Of Railway Line Lahat-Kertapati In South Sumatra L A - - - -
Cilamaya New Port Development Project L A - - - -
Development of New Tunnels Alignment in Payakumbuh - Pangkalan Toll Road L A - - - -
Engineering Service for Cilamaya New Port Development Project L A - - - -
Engineering Sevice for Indramayu Coal Fired Power Plant (Clean Coal Technology) Project L A - - - -
Hululais Geothermal Power Plant Project L A - ·EIA (Feb. 14, 2020) (PDF/44.0MB)
·EIA (Feb. 14, 2020) (PDF/62.8MB)
·EPC(Feb. 14, 2020) (PDF/29.9KB)
·EPC(Feb. 14, 2020) (PDF/37.8KB)
- -
Indramayu Coal Fired Power Plant Project (I) L A ·Preparatory Survey for Indramayu Coal-fired Power Plant Project in Indonesia: Final Report (Feb. 14, 2018) (PDF/49.2MB)
·
·EIA (Dec. 21, 2015) (PDF/22.5MB)
·EPC (Dec. 21, 2015) (PDF/2.84MB)
·EIAEnglish (Mar. 23, 2016) (PDF/26.7MB)
·RAP(Feb. 14, 2018) (PDF/5.47MB)
·
- -
Integrated Water Resources and Flood Management Project for Medan L A - - - -
Jakarta Mass Rapid Transit System East-West Line Project L A - - - -
Java High Speed Railway Development Project (Phase I) L A - - - -
Merangin Hydroelectric Power Generation Project L A - - - -
Metropolitan Arterial Road Improvement Project L A - - - -
Patimban Port Development Project L A ·Preparatory Survey (Mar 29, 2017) (PDF/51.2MB)
·EIA (Mar 14, 2017) (PDF/31.2MB)
· EMP, EMoP (Mar 14, 2017) (PDF/3.92MB)
·LARAP (Mar29, 2017) (PDF/8.69MB)
·EPC(Mar 29, 2017) (PDF/2.15MB)
- ·Monitoring report (Oct - Dec, 2019) (PDF/3.84MB)
Patimban Port Toll Road Project L A - - - -
Soekarno-Hatta Airport Railway Access Project L A - - - -
West JAVA Regional Solid Waste Treatment and Final Disposal L A ·Preparatory Survey (Mar. 2012)
- - -
West Kalimantan Province Reforestation and Forest Products Processing Project L A - - - -
Preparatory Survey on BOP business on egg farming and sales marketing SDGs-FS/BOP-PS B ·Preparatory Survey on BOP Business on Egg Farming and Sales Marketing Report : Summary
·N/A
·Environmental Review (Japanese) (PDF/145KB)
·N/A
SEZ Development Master Plan Survey in Indonesia TCDP B - - - -
Application of Waste water Reclaiming in Southern Bali water supply system L B - - - -
Bali Beach Conservation Project - Phase II L B ·The preparatory survey on Bali beach conservation project-phase II in the Republic of Indonesia final report : summary : simple version (3.04MB)
·EIA(Jan 01,2017) (PDF/2.38MB)
·Environmental Review (PDF/119KB)
-
Central and West Java 500kv Transmission Line Project L B - - - -
Infrastructure Reconstruction Sector Loan in Central Sulawesi L B - - - -
Intelligent Transport System Project to Eliminate Traffic Congestion in JABODETABEK Area L B - - - -
Jabodetabek Railway Capacity Enhancement Phase I L B - - - -
Jakarta Integrated Urban Transport Hub Development Project L B - - - -
Jakarta Sewerage Development Project (Zone 1) L B - - - -
Jakarta Sewerage Development Project (Zone 6) (Phase 1) L B - - - -
Komering Irrigation Project III L B ·-N/A
·EIA (PDF/11.3MB)
·Environmental Review
·-
Lebak Bulus Station Area Development Project L B - - - -
Makassar Airport Upgrade and Operation Project through Aviation Network Reconfiguration L B - - - -
Preparatory Survey for Mini Hydropower Development Project in North Sumatra L B - - - -
Preparatory Survey for New Research Cluster (NARC) PPP Project L B ·Preparatory Survey (Mar. 2014)
- - -
Preparatory Survey for Renovation and expansion of the Lombok International Airport L B - - - -
Preparatory Survey on New Urban Transportation System in the Cikarang Complex City in Republic of Indonesia L B ·-
·N/A
- -
Rentang Irrigation Modernization Project L B ·N/A
·N/A
·Environmental Review
-
Small Hydro Projects in Sumatra and Sulawesi L B - - - -
Umbulan Spring Water Distribution System Project in East Java L B - - - -
Urban Flood Control System Improvement in Selected Cities (Phase 2) L B - - - -
Urgent Disaster Reduction Project for Mount Merapi II L B ·N/A
·N/A
·Urgent Disaster Reduction Project for Mount Merapi and Lower Progo River Area II
-
West Jawa Small Hydropower Project L B - - - -
Verification Survey for Introduction of the Ground Improvement with the Middle Layer Soil Mixing Method for Development of Transport Infrastructure SSM-VS B - - - -
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Automatic Regenerating Activated Carbon Wastewater Purification System SSM-VS B ·Final Report (in Japanese) (PDF/3.14MB)
·N/A
·Environmental Review (In Japanese) (PDF/196KB)
·Result of Monitoring (in Japanese) (PDF/3.14MB)
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Automatic Regenerating Activated Carbon Wastewater Purification System SSM-VS B - - - -
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Compact Environmentally Friendly Incinerators SSM-VS B - - - -
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Eco-friendly Concrete Products to Develop Infrastructure SSM-VS B ·Final Report (In Japanese)(PDF/7.71MB)
·N/A
·Environmental Review (In Japanese) (PDF/164KB)
·Result of Monitoring (in Japanese) (PDF/7.71MB)
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Eliminating Power Shortage in Rural Area by Flume-Adapted Small Hydroelectric System SSM-VS B - - ·Environmental Review (in Japanese),(Oct.27.2017) (PDF/157KB)
-
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Non-incineration Domestic Waste Disposal System by Local Government with Community Participation SSM-VS B - - - -
Feasibility Survey for Improving Service of Drinking-water in Surabaya SSM-FS B - - - -
Feasibility Survey for Producing Paper Pulp from Empty Fruit Bunch SSM-FS B - - - -
Feasibility Survey for Project Formulation on the Dissemination of Compact Environmentally Friendly Incinerators SSM-FS B ·Final Report (in Japanese)(PDF/4.25MB)
·N/A
·N/A
·N/A
Feasibility Survey for an Application of Dehydrator for a Pre-Treatment of Septage to the Existing Waste Water Treatment Plant in Batam SSM-FS B - - - -
Feasibility Survey for an Application of Microbial Treatment Equipment BIOALSI to Sewage Treatment and Excreta Disposal SSM-FS B ·Final Report (in Japanese)(PDF/3.22MB)
·N/A
·N/A
·N/A
Feasibility Survey for the flume-adaptive small hydroelectric system development for eliminating power shortage in Indonesia SSM-FS B - - - -
Feasibility Survey for the introduction of the initial fire extinguishing technology on forest fire suppression SSM-FS B - - - -
Feasibility Survey for the support of development for transport infrastructure through soil improvement with the Interlayer Mixing Method SSM-FS B - - - -
Feasibility Survey with the Private Sector for Utilizing Japanese Technologies in ODA Projects“Introducing decentralized domestic wastewater treatment system of Johkasou for public building” SSM-FS B - - - -
Feasilibity Survey for Rehabilitation of Intake Weir by Inflatable Rubber Dam Technology SSM-FS B - - - -
Promoting cacao export and supporting small farmer business project L FI - - - -
Renewable Energy and Infrastructure Promotion Facility L FI - - - -
Rural Settlement Infrastructure and Kabupaten Strategic Area Development ((RISE)II) L FI - - ·Environmental Review
-
The Project for Development of Regional Disaster Risk Resilience Plan in Central Sulawesi GA FI - - - -

Laos

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Xe Katam Hydropower Project L A - - - -
Project for Institutional Capacity Building for Sustainable Urban Transport System TCP B - - - -
Project on Power System Master Plan TCDP B ·Enviomental and Social Considerations in Detailed Planning Survey (PDF/435KB)
·Minutes of Meetings of Detailed Planning Survey (PDF/26.5KB)
- - -
Nam Ngum 1 Hydropower Station Expansion Project L B ·Final Report on Preparatory Survey (Jan.2010)
- ·Environmental Review (PDF/35.2KB)
·Monitoring Report (Mar, 2020) (PDF/3.35MB)
Southern Region Power Network Development Project L B - - ·Environmental Review (PDF/35.1KB)
·Report Letter (PDF/1.94MB)
Vientiane Capital Water Supply Expansion Project L B ·Preparantry Survey Final Report
·IEE(Jan.15.2018) (PDF/3.55MB)
·Result in Review(in Japanese)
-
Vientiane Logistics Park (VLP) Project in Lao P.D.R L B - - - -
Wattay International Airport Terminal Expansion Project L B - - - -
Mini-Hydropower Development Project GA B - - - ·confirmation letter on Environmental and Social impact (PDF/354KB)
Project for Improvement of Solid Waste Management in Environmental Sustainable Cities GA B - - - -
Thakhek Water Supply Development Project GA B ·Preparatory Survey(PDF/3.62MB)
·Appendix 1(PDF/3.11MB)
·Appendix 2(PDF/3.56MB)
·Appendix 3(PDF/3.64MB)
·N/A
·Environmental Review (In Japanese)(PDF/117.0KB)
-
The Project for Construction of Sekong Bridge on NR16B in the Southern Region of Laos GA B ·Report (Dec. 1, 2013)(PDF/7.73MB)
·N/A
- ·MonitoringReport_Jan2018 (PDF/49.5KB)
The Project for Expansion of Water Supply System in Luang Prabang GA B - - - -
The Project for Reconstruction of the Bridges on the National Road No.9 GA B ·Report (Feb. 1, 2016)(PDF/10.3MB)
·N/A
- ·Monitoring Report (Apr 2018) (PDF/880KB)
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Export Promotion by Utilizing Japanese Wood-Processing Skills. SSM-VS B - - - -
Feasibility Survey for Conservation and Sustainable Commercial Utilization of Medicinal Plants SSM-FS B - - - -
Feasibility Survey for Durable Road Construction by Utilizing Precast Concrete in Laos SSM-FS B ·-
·N/A
·-
·-
Feasibility Survey for realization of high productivity and high value added agriculture SSM-FS B ·Final Report (in Japanese)(PDF/6.46MB)
- ·N/A
·N/A
Feasibility Survey for the Efficient Charcoal Production Systems SSM-FS B ·Final Report (in Japanese)(PDF/10.5MB)
·N/A
·N/A
·N/A
Feasibility Survey for the dissemination of Indoor Shrimp Production System (ISPS) SSM-FS B - - - -
Feasibility survey for improvement of medical and other hazardous waste management in Vientiane city SSM-FS B ·表紙~第1章(16.1MB)
·第2章~第3章(10.3MB)
·第4章~別添1(10.3MB)
·
- - -

Malaysia

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Creation of the Best Optimized Water Infrastructure PPP in Major Urban Areas L B - - - -
Photovoltaic Power Generation (Econation) Project with focus on the Northern Corridor Development L B - - - -
Feasibility Survey for Food Waste Composting and Creating of Recycling Loop SSM-FS B ·-
·N/A
·N/A
·N/A
Feasibility Survey for Utilizing Super Well Point Method for Soft Ground Improvement and Flood Prevention SSM-FS B - ·N/A
·N/A
·N/A
SDGs Business Model Formulation Survey with the Private Sector for Waste and Waste Tire Management by Using Fuel from Waste Tire in Kota Kinabalu, Sabah, Malaysia SSM-FS B - - - -

Myanmar

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Kyaukse Gas Combined-Cycle Power Plant Construction Project L A - - - -
Preparatory Survey on Myanmar Hanthawaddy International Airport Project L A - - - -
The Project for Strengthening Connectivity of International Highway in Mekong L A - - - -
Thilawa Special Economic Zone (Class-A Area) Development Project L A ·N/A
·EIA(Dec.11, 2013) (PDF/9.04MB)
·EPC(Dec.11, 2013) (PDF/81KB)
·RAP(Feb.14, 2014) (PDF/2.27MB)
·Environmental Review
·Environmental Monitoring Report (Operation Phase, October 2019) (PDF/63.5MB)
Thilawa Special Economic Zone (Industrial Area of Zone B) Development Project L A ·N.A.
·EIA (June. 10, 2016) (PDF/19.0MB)
·EPC (June. 10, 2016) (PDF/446KB)
·EIA Appendix (June. 10, 2016) (PDF/7.23MB)
·RAPRAP Area 2-1 (Sept. 5, 2016) (PDF/5.80MB)
·RAPRWP Area 2-2 East (Jan. 13, 2017) (PDF/5.24MB)
·RAPRWP for Expanded Area of Area 2-1 (Feb 15, 2018) (PDF/3.36MB)
·RAPRWP for Expanded Area of Area 2-1 No.2 (Nov 12, 2018) (PDF/2.28MB)
·RAPRWP for Area 3-1 (Jan 24, 2019) (PDF/2.53MB)
·RAPRWP for Area 2-2 West (Part 1) (Sep, 2019) (PDF/6.67MB)
·Environmental Review (PDF/141KB)
·Environmental Review_Zone B Phase 2 (PDF/183KB)
·Environmental Monitoring Report Zone B Phase 1&2 Operation (March 2020) (PDF/79.8MB)
Thilawa Special Economic Zone (SEZ) Development Project L A ·Preparatory survey on Thilawa SEZ development project in the Republic of the union of Myanmar : final report
- - -
Yangon Outer Ring Road (Eastern section) Construction Project L A - - - -
Yangon Urban Mass Rapid Transit Construction Project L A - - - -
Project for Capacity Development of Power Sector Development Planning TCP B ·Environmental and Social Considerations in Detailed Planning Survey (PDF/654KB)
·N/A
·Environmental Review (Japanese)
·N/A
The Project for Human Resource Development of Medical Engineering TCP B ·N/A
·N/A
·N/A
·-
The Preparatory Survey for Urban Development Programme in the Greater Yangon TCDP B - - - -
The Project for Sustainable Planning and Improvement of Solid Waste Management in Yangon City TCDP B ·Record of Discussion (6. August, 2019) (PDF/402KB)
·Environmental and Social Considerations in Detailed Planning Survey(6.August, 2019) (PDF/976KB)
- - -
The Project for the Integrated Regional Development Plan to Support Ethnic Minorities in the South-East Myanmar TCDP B - - - -
Agriculture Income Improvement Project L B - - ·Environmental Review (PDF/298KB)
-
Agriculture Income Improvement Project (Phase 2) L B ·N/A
- - -
Bago River Bridge Construction Project L B ·The supplemental survey for the project for construction of Bago river bridge : final report (PDF)
- ·Environmental Review (PDF/112KB)
-
Communication Network Improvement Project L B ·Preparatory Survey (PDF/10.1MB)
·N/A
··Environmental Review (May. 7, 2015) (PDF/200KB)
·N/A
East-West Economic Corridor Highway Development Project (New Bago-Kyaikto Highway Section) L B - - - -
East-West Economic Corridor Improvement Project L B - - - -
Greater Yangon Water Supply Improvement Project L B ·Preparatpry Survey (PDF/38.7MB)
·N/A
·Environmental Review (April. 7, 2015) (PDF/107KB)
·Monitoring Form
Greater Yangon Water Supply Improvement Project (Phase II) L B ·Preparatory Survey for Greater Yangon Water Supply Improvement Project (Phase II) Final Report
- ·Environmental Review (PDF/77KB)
-
Hydropower Plants Rehabilitation Project L B ·Preparatory survey on Hydropower plants Rehabilitation project in the Republic of the Union of Myanmar : Final Report (Nov., 2016)
- ·Ex-Ante Evaluation (PDF/142KB)
·N/A
Infrastructure Development Projcet in Thilawa Area Phase I L B ·(Electric Power) Infrastructure Development Project in Thilawa (PDF/1.92MB)
·(Port) Infrastructure Development Project in Thilawa (PDF/1.70MB)
- ·Environmental Review (April. 7, 2015) (PDF/65KB)
·Monitoring Report (Port) (September, 2018) (PDF/6.40MB)
Infrastructure Development Project in Thilawa Area Phase II L B - - ·Environmental Review (April. 7, 2015) (PDF/66KB)
-
Infrastructure Development Project in Thilawa Area Phase III L B - - - -
Inland Water Transport Facilities Improvement and Development Project L B - - - -
Irrigation Development Project in Western Bago Region L B - - - ·Enviromental Monitoring Plan (PDF/251KB)
Irrigation Development Project in Western Bago Region L B - ·N/A
·Environmental Review (April. 7, 2015) (PDF/119KB)
·Enviromental Monitoring Plan (PDF/8.99MB)
National Power Transmission Network Development Project L B - - ··Environmental Review (May. 7, 2015) (PDF/185KB)
-
National Power Transmission Network Development Project Phase II L B - - - -
National Power Transmission Network Development Project Phase III L B - - - -
Power Distribution Improvement Project in Yangon Phase I L B ·Preparatory Survey (PDF/3.56MB)
·N/A
·Environmental Review (PDF/81KB)
·N/A
Power Distribution System Improvement Project in Major Cities L B ·Republic of the Union of Myanmar Preparatory Survey on Distribution Improvement Project in Main Cities
- ·Environmental Review (PDF/112KB)
-
Preparatory Survey for Yangon Private Hospital Project L B - - - -
Preparatory Survey on Heho Airport Development Project L B - - - -
Regional Development Project for Poverty Reduction Phase I L B ·N/A
·N/A
·Environmental Review (April. 7, 2015) (PDF/79KB)
·N/A
Regional Development Project for Poverty Reduction Phase II L B ·Preparatory Survey for Regional Development Project for Poverty Reduction Phase II final report (PDF)
- ·Environmental Review(PDF/121.96KB)
-
Regional Infrastructure Improvement Project L B - - - -
The Enhancement of the Efficient Operation of Thilawa Area Port and Logistics Depot Project L B - - - -
Urban Area Power Distribution Improvement Project L B ·N/A
·N/A
- -
Urgent Rehabilitation and Upgrade Project (Renovation of the Kyangin Cement Factory) L B - - - -
Urgent Rehabilitation and Upgrade Project Phase I L B ·N/A
·N/A
·Environmental Review (April. 7, 2015) (PDF/62KB)
·N/A
Yangon Circular Line Upgrading Project L B - - - -
Yangon Port Expansion Project in Thilawa Area L B - - - -
Yangon Sewerage System Development Project L B - - - -
Yangon Urban Development Project L B - - - -
Yangon-Mandalay Railway Improvement Project Phase I L B - - ·Environmental Review (PDF/77KB)
-
Yangon-Mandalay Railway Improvement Project Phase II L B - - ·Environmental Review (PDF/230KB)
-
Project for Mandalay Inland Port Establishment GA B - - - -
The Project for Construction of New Thaketa Bridge GA B ·Report (Nov. 1, 2014)(PDF/6.88MB)
·N/A
·Environmental Review (Japanese) (April. 10, 2015) (PDF/152KB)
-
The Project for Improvement of Education College GA B - - ·Environmental Review (Japanese) (April. 10, 2015) (PDF/124KB)
-
The Project for Rural Infrastructure Development in Local Areas GA B - - - -
The Project for Urgent Expansion of Water Supply System in Mandalay City GA B ·Preparatory Survey Volume 1(PDF/6.45MB)
·Volume 2(PDF/20.13MB)
·Volume 3 & Appendix 1(PDF/7.68MB)
·Appendix 2(PDF/9.16MB)
·Appendix 3(PDF/9.16MB)
·Appendix 4(PDF/9.99MB)
·Appendix 5(PDF/9.95MB)
·Appendix 6(PDF/33.87MB)
·N/A
·Environmental Review (In Japanese)(PDF/330.7KB)
·EIA(MAR14.2018) (PDF/2.58MB)
The Project for Urgent Improvement of Water Supply System for Yangon City GA B ·Preparatory Survey(PDF/3.71MB)
·Appendix 1(PDF/3.76MB)
·Appendix 2(PDF/2.96MB)
·N/A
·Environmental Review (In Japanese)(PDF/176.5KB)
-
Collaboration Program with the Private Sector for Disseminating Japanese Technology for Construction Soil Improving Method (Twister Method) CP B - - ·Result of Review (In Japanese) (PDF/235KB)
-
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Small Scale Sewerage System with Energy Saving Technology SSM-VS B ·Final Report (In Japanese)
- - -
Feasibility Survey for Quality Seed Production, Processing and Sales Project for Intensive Agriculture SSM-FS B - - - -
Feasibility Survey for Shrimp Hatchery Technologies in Myanmar SSM-FS B - - - -
Feasibility Survey for System Introduction on Collection, Transportation and Incineration of Medical Waste for the Preparation of Private Consignment in Yangon, Myanmar SSM-FS B ·N/A
·N/A
·N/A
·N/A
Feasibility Survey for popularizing the textile industry technology utilizing the new processing technology SSM-FS B - - - -
Feasibility Survey for renovation of sericulture and reeling industry SSM-FS B - - - -
Project for the Development of Finance for Small and Medium-sized Enterprises (Phase 2) L FI ·Preparatory Survey (PDF/844KB)
- ·Environmental Review (PDF/236KB)
-
Project for the Development of Finance for Small and Medium-sized Enterprises (Phase 3) L FI ·N/A
·N/A
- ·N/A
Small and Medium-sized Enterprises Finance Promotion Project L FI ·Preparatory Survey (PDF/844KB)
·N/A
·Environmental Review (PDF/149KB)
·N/A

Philippines

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Study on the Strategic Railways Networks for the Greater Capital Regions (Connecting Clark and Metro Manila) TCDP A - - - -
Arterial Road Bypass Project(Phase 3) L A - ·RAPRAP(Sep.27,2017)(PDF4.78MB) (PDF/4.79MB)
·EIA2017(Sep.27,2017)(PDF33.0MB) (PDF/33.0MB)
·EIA2002(Sep.27,2017)(PDF25.9MB) (PDF/25.9MB)
·EPC2002(Sep.27,2017)(PDF524KB) (PDF/524KB)
·EPC2008(Sep.27,2017)(PDF5.37MB) (PDF/5.37MB)
- -
Cavite Industrial Area Flood Management Project L A ·Preparatory Survey (PDF/7.31MB)
·EIA(EIS) (June. 19, 2017) (PDF/12.0MB)
·EPC(ECC) (June. 19, 2017) (PDF/4.56MB)
·RAP(July. 3, 2017) (PDF/1.32MB)
- -
Cavite Laguna Expressway Project (Laguna Section) L A - ·EIA (PDF/18.3MB)
·ECC (Mar. 14, 2013) (PDF/913KB)
- -
Cebu-Mactan Bridge and Coastal Road Construction Project L A ·Preparatory Survey (Sep, 19, 2019) (PDF/104MB)
·RAP(Sep, 19, 2019) (PDF/10.1MB)
·EIA (Sep, 19, 2019) (PDF/82.3MB)
·EPC (Sep, 19, 2019) (PDF/3.64MB)
- -
Central Luzon Link Expressway Project L A ·Report (Nov. 18, 2011) (PDF/16.6MB)
·EIA (PDF/62.9MB)
·ECC (Nov. 18, 2011) (PDF/161KB)
·RAP (Nov. 18, 2011) (PDF/10.9MB)
·Environmental Review (PDF/52KB)
·Environmental Monitoring Report (Jun, 30, 2020) (PDF/260KB)
Central Mindanao High Standard Highway Construction Project (Cagayan de Oro-Malaybalay Section) L A - - - -
Circumferencial Road (C3) Project L A - - - -
Dalton Pass East Alignment Alternative Road Project L A - - - -
Davao City Bypass Construction Project (South and Center Sections) L A ·Preparatory Survey (Oct. 2014) (PDF/18.9MB)
·RAP(Apr.10,2019) (PDF/20.1MB)
·EIA(Apr.10,2019) (PDF/72.6MB)
·ECC (Apr.10,2019) (PDF/292KB)
·Updated EIS (Jun.19,2019) (PDF/2.67MB)
·Amendment of ECC (Jun.19,2019) (PDF/29.8KB)
·Amendment of ECC (Sep.12,2019) (PDF/271KB)
·
·Environmental Review (PDF/115KB)
-
Flood Risk Management Project for Cagayan de Oro River L A ·Report (Mar. 2014)
·EIA (EIS) (Nov. 26, 2013) (PDF/10.3MB)
·ECC (Nov. 26, 2013) (PDF/939KB)
·RAP (Dec. 6, 2013) (PDF/2.19MB)
·Environmental Review(PDF)
-
Metro Manila Central Business Districts Transit System Project L A - - - -
Metro Manila Subway Project L A ·DFR (Oct. 24, 2017) (PDF/247MB)
·EIA (EIS) (Oct. 24, 2017) (PDF/8.30MB)
·EIA(Updated EIS) (Dec.11, 2019) (PDF/136MB)
·EPC(ECC) (Oct. 26, 2017) (PDF/1.97MB)
·EPC(Amendment of ECC) (Dec.11, 2019) (PDF/984KB)
·RAP (Oct. 24, 2017) (PDF/7.38MB)
- -
NAIA Expressway Project L A - - - -
New Bohol Airport Construction and Sustainable Environment Protection Project L A ·DFR (Aug. 6, 2012) (PDF/27.7MB)
·EIA (Jul. 23, 2012) (PDF/35.4MB)
·ECC (Jul. 23, 2012) (PDF/160KB)
·ECC (Jul. 23, 2012) (PDF/199KB)
·ECC(Dec.21, 2017)(PDF/104KB) (PDF/104KB)
·RAP (Sep. 30, 2013) (PDF/11.1MB)
·Environmental Review(PDF/178KB) (PDF/179KB)
·Quarterly Environmental Monitoring Report 2018 (October, November and December) (PDF/368KB)
North South Commuter Railway Project L A - ·EIA (Nov. 29, 2013) (PDF/8.67MB)
- -
North-South Commuter Railway Extension Project, Malolos-Clark L A ·DFR(Oct. 11, 2018) (PDF/69.8MB)
·EIA(EIS)(Aug.17, 2018) (PDF/31.6MB)
·EPC(ECC)(Aug.13, 2018) (PDF/326KB)
·RAP(Oct. 11, 2018) (PDF/7.06MB)
- -
North-South Commuter Railway Extension Project, Solis-Calamba L A ·DFR(Oct. 11, 2018) (PDF/63.4MB)
·EIA(EIS)(Aug.17,2018) (PDF/25.3MB)
·EPC(ECC)(Aug.13,2018) (PDF/348KB)
·RAP(Oct. 11, 2018) (PDF/18.9MB)
- -
PPP Project for Development of a connector road in Manila L A ·Preparatory Survey (Oct. 2011) (PDF/3.08MB)
- - -
Pasig-Marikina River Channel Improvement Project (Phase 4) L A - ·EIA(EIS)(September. 11, 2018) (PDF/38.1MB)
·EPC(ECC)(September. 11, 2018) (PDF/1.30MB)
·RAP Volume1(September. 11, 2018) (PDF/6.48MB)
·RAP Annex1(September. 11, 2018) (PDF/17.8MB)
·RAP Volume2(September. 19, 2018) (PDF/3.52MB)
·RAP Annex2(September. 11, 2018) (PDF/4.20MB)
- -
Pasig-Marikina River Channel Improvement Project (Phase III) L A ·Preparatory Survey Volume1(Oct, 2011)
·Preparatory Survey Volume2(Oct, 2011)
·Preparatory Survey Volume3(Oct, 2011)
·EIS(EIA)/ECC(EPC) (Oct. 20, 2011) (PDF/6.52MB)
·Supplemental EIS (Oct. 20, 2011) (PDF/10.7MB)
·RAP (Oct. 20, 2011) (PDF/10.3MB)
·Environmental Review (PDF/100KB)
-
The North South Railway Project Phase I/Malolos - Tutuban L A ·THE SUPPLEMENTARY SURVEY ON NORTH SOUTH COMMUTER RAIL PROJECT (PHASE II-A) IN THE REPUBLIC OF THE PHILIPPINES PRE-FINAL REPORT
·EIA(EPRMP) (Apr, 28, 2015) (PDF/6.80MB)
·EPC(ECC) (Apr, 28, 2015) (PDF/3.09MB)
·RAP(Apr, 28, 2015) (PDF/3.64MB)
·Environmental Review(PDF/154KB)
-
Davao City Infrastructure Development Plan and Capacity Building Project TCDP B ·ESC (PDF/324KB)
·RD (PDF/4.17MB)
- - -
Master Plan Study on Urban Transport System Development in Metro Cebu Project TCDP B - - - -
Project for Flood Control in Davao TCDP B - - - -
Project on Formulation of a 30-Year Railway Master Plan for the Greater Manila Area TCDP B - - - -
Project on Master Plan Study and Institutional Development on Urban Transport System in Metro Cebu TCDP B ·ESC in Detailed Planning Survey (PDF/383KB)
·M/M (PDF/555KB)
- - -
The Project for Master Plan Study on Comprehensive Sewerage System Development TCDP B - - - -
The project for study on improvement of the bridges through large scale earthquakes disaster mitigating measures TCDP B ·Environmental and Social Considerations in Detailed Planning Survey (PDF/2.68MB)
- - -
Arterial Road Bypass Project (Phase II) L B ·N/A
- - -
Capacity Enhancement of Mass Transit Systems in Metro Manila Project L B ·N/A
·N/A
·Environmental Review(PDF/183KB)
-
Flood Risk Management Project for Cagayan River, Tagoloan River and Imus River L B ·THE PREPARATORY STUDY FOR SECTOR LOAN ON DISASTER RISK MANAGEMENT
- ·Environmental Review(PDF)
-
LRT Line 2 Extension Project L B - - - -
Malitubog-Maridagao Irrigation Project (Phase2) L B - - - -
Metro Manila Interchange Consturction Project (Phase VI) L B ·N/A
- - -
Metro Manila Priority Bridges Seismic Improvement Project L B - - - -
Metro Rail Transit Line 3 Rehabilitation Project L B - ·N/A
- -
Mindanao Sustainable Agrarian and Agriculture Development Project L B ·N/A
- - -
National Irrigation Sector Rehabilitation and Improvement Project L B ·N/A
- ·Environmental Review (PDF/90KB)
-
Preparatory Survey for Ambulatory Surgical Center / Hospital Development Project L B - - - -
Road Network Development Project in Conflict Affected Areas in Mindanao L B ·PREPARATORY SURVEY FOR ROAD NETWORK DEVELOPMENT PROJECT IN CONFLICT-AFFECTED AREAS IN MINDANAO FINAL REPORT < VOLUME-I >
·PREPARATORY SURVEY FOR ROAD NETWORK DEVELOPMENT PROJECT IN CONFLICT-AFFECTED AREAS IN MINDANAO FINAL REPORT < VOLUME-II-1 >
·PREPARATORY SURVEY FOR ROAD NETWORK DEVELOPMENT PROJECT IN CONFLICT-AFFECTED AREAS IN MINDANAO FINAL REPORT < VOLUME-II-2 >
·EIA SP2 Parang-Balabagan Road (PDF/15.4MB)
·EIA SP7 Marawi City Ring Road (PDF/11.7MB)
·EIA SP8 Parang East Diversion Road (PDF/10.2MB)
·EIA SP9 Manuangan-Parang Road (PDF/12.5MB)
·RAP SP2 Parang-Balabagan Road (PDF/4.64MB)
·RAP SP7 Marawi City Ring Road (PDF/4.28MB)
·RAP SP8 Parang East Diversion Road (PDF/4.32MB)
·RAP SP9 Manuangan-Parang Road (PDF/2.55MB)
·Result of Review (PDF/258KB)
-
Water Supply and Sewerage Development Project in the West Zone of Metro Manila L B - - - -
Wawa River Small Hydro Power Project L B - - - -
Mini-Hydropower Project in the Province of Ifugao GA B - - - -
Septic Tank Sludge Treatment Construction Project for Metro Cebu GA B - - - -
The Project for Community Development in Conflict-Affected Areas in Mindanao GA B - - - ·Lot 3 Monitoring Report (Dec 2017) (PDF/1,014KB)
Pilot Survey for Disseminating SME's Technologies for Applicability of Dewatering Equipment for Septage Management of Cebu City SSM-VS B ·Pilot Survey for Disseminating SME's Technologies for Applicability of Dewatering Equipment for Septage Management of Cebu City Summary Report (PDF/3.19MB)
·N/A
·Environmental Review (In Japanese) (PDF/236KB)
·Pilot Survey for Disseminating SME's Technologies for Applicability of Dewatering Equipment for Septage Management of Cebu City Summary Report (PDF/3.19MB)
Pilot Survey for Disseminating SME’s Technologies for Solid Waste Management and Resource Recycling in Cebu City SSM-VS B - - - -
Feasibility Survey for Introduction of Refuse Paper & Plastic Fuel (RPF) SSM-FS B ·Final Report (in Japanese)(PDF/2.47MB)
·N/A
·N/A
·N/A
Feasibility Survey for Introduction of a Wastewater Treatment Improvement Technology Utilizing Equipment for Dispersible Microbe Systemin the Philippines SSM-FS B - ·
- -
Feasibility Survey for prevailing on the local Bio Diesel Fuel Production System for local consumption SSM-FS B ·Final Report (in Japanese)(PDF/3.65MB)
·N/A
·N/A
·N/A
Feasibility Survey for promoting the coastal aquaculture system of sea urchin SSM-FS B - - - -
Feasibility Survey for the Utilization of Self-Navigation Assembly Salvage Barge for the Construction Works on Disaster Management and Disaster Restoration in the Philippines SSM-FS B - - - -
Program on Economic-Growth through Agribusiness Cooperation and Entrepreneurship (PEACE) L FI ·N/A
- ·-
·-
Programme for the Support for Rehabilitation and Reconstruction of Marawi City and its Surrounding Areas GA FI - - - -
The Programme for Rehabilitation and Recovery from Typhoon Yolanda GA FI - - - -

Thailand

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Bangkok - Chiang Mai High-Speed Rail Development Project L A - - - -
Project for Strengthening Institutional Capacity for the Implementation of Bangkok Master Plan on Climate Change 2013-2023 TCP B ·Report(Aug.2016 In Japanese) (PDF/2.97MB)
·
·Environmental Review (In Japanese) (PDF/290KB)
-
Project for Flood Countermeasures for Thailand Agricultural Sector TCDP B ·Environmental and Social Considerations in Detailed Planning Survey (PDF/299KB)
- - -
Project on a Comprehensive Flood Management Plan for the Chao Phraya River Basin TCDP B - - - -
The Project for Promoting Sustainability in Future Cities of Thailand TCDP B - - - -
Preparatory survey for Industrial Estate Smart Community Development Project L B - - - -
Southern Economic Corridor Freight Railway Development Project L B - - - -
Flood Prevention Project of East Side of the Pasak River in Ayutthaya GA B - - - -
Preparatory survey on the flood prevention project of east side of the Pasak river in Ayutthaya in the Kingdom of Thailand GA B ·Preparatory survey report on the flood prevention project of east side of the Pasak river in Ayutthaya in the Kingdom of Thailand
·RAPAbbreviated Resettlement Action Plan
- -
The Project for Reconstruction of the Nippon Causeway GA B - - - -
The Rehabilitation Project of the Outer Bangkok Ring Road (East Portion) GA B ·Report (Aug. 1, 2012)(PDF/4.17MB)
·N/A
- -
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Appropriate Medical Waste Disposals by the Next Generation’s Incinerators SSM-VS B - ·N/A
·Environmental Review (In Japanese) (PDF/179KB)
-
Feasibility Survey for Appropriate Medical Waste Disposals by Next-Generation Incinerators SSM-FS B ·Final Report (in Japanese)(PDF/2.61MB)
·N/A
·N/A
·N/A
Feasibility Survey for Introducing recovery method of toxic waste material and enhancing venous industry through propagation of material recovery technology SSM-FS B - - - -
Feasibility Survey for Plastic Rainwater Storage Structure SSM-FS B ·-
·N/A
·N/A
·N/A

Timor-Leste

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Project for Study on Dili Urban Master Plan TCDP B - - - -
The Project for Agriculture Master Plan and Irrigation Development Plan TCDP B ·R/D (PDF/324KB)
·ESC in Detailed Planning Survey
- - -
The Project on Strategic Port Development Master Plan in Timor-Leste TCDP B - - - -
National Road No.1 Upgrading Project L B - ·EIA(SEIS) (PDF/4.62MB)
- ·Environmental Monitoring Report (PDF/1.50MB)
Project for Rehabilitation and Improvement of Buluto Irrigation Scheme GA B - - - -
The Project for Construction of Upriver Comoro Bridge GA B ·Report (Feb. 1, 2014)(PDF/7.12MB)
·N/A
- ·Monitoring Report 2 (Feb 2018) (PDF/448KB)
The Project for Improvement of Presidente Nicolau Lobato International Airport GA B - - - -
The Project of River Training for the Protection of Mola Bridge GA B ·Report (Feb. 1, 2013)(PDF/5.90MB)
·N/A
- -
The Project of Urgent Shift of Ferry Terminal in Dili Port GA B ·Preparatory Survey(In Japanese/PDF/40.4MB)
·N/A
- ·Oct2019 (Noise/Pollution) (PDF/349KB)
Feasibility Survey for Constructing Global Food Value Chain Utilizing Production of High-Quality Seafood by Harikai Methods SSM-FS B - - - -

Viet Nam

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Bac Ai Pumped Storage Power Plant Construction Project L A - - - -
Bac Lieu High Efficiency Thermal Power Plant and Transmission Lines Construction Project L A - - - -
Ben Tre Water Management Project L A ·Preparatory Survey (October 2016) (PDF/12.9MB)
·EIA (10 November, 2016) (PDF/5.41MB)
·EPC (15 November, 2016) (PDF/143KB)
·RAP (December 20, 2016) (PDF/3.87MB)
·Resettlement Policy Framework (December 16, 2016) (PDF/3.14MB)
- -
Bien Hoa - Vung Tau Expressway Project L A - - - -
Hai Phong Arterial Road Construction Project L A - - - -
Hanoi City Ring Road No. 3 Construction Project (Mai Dich - South Thang Long Section) L A - ·EIA (Jun. 3, 2013) (PDF/7.71MB)
·EIA in Enflish (Sep. 2,2019) (PDF/15.2MB)
·Ex-Ante Evaluation (PDF/224KB)
·PK1 Semi-Anual Environmental Monitoring (PDF/191KB)
Hanoi City Uran Railway Constructino Project (Line 5) L A - - - -
Ho Chi Minh City Urban Railway Construction Project (Ben Thanh – Mien Tay (Line 3A Phase1) L A - - - -
Import Coal Transshipment Terminal Project L A - - - -
Long Thanh International Airport Development Project L A ·Preparatory Survey (Feb. 2012)
- - -
Long Thanh International Airport Development and Passenger Terminal Management Project L A - - - -
North-South Expressway Construction Project (Ben Luc - Long Thanh Section) L A ·N/A
·EIA (PDF/353MB)
·EIA in English
·RAP (PDF/1.04MB)
·EPC (PDF/216KB)
·Environmental Review (PDF/132KB)
·Monitoring Form for Resettlement Site (PDF/22.0KB)
O Mon III Combined Cycle Power Plant Construction Project L A ·Preparatory Survey (Apr. 27, 2012) (PDF/16.1MB)
·EIA (Apr. 27, 2012) (PDF/12.7MB)
·DDR (2011) (Apr. 27, 2012) (PDF/804KB)
- -
Preparatory Survey for Bach Dang Bridge on Ha Long-Hai Phong Highway Development Project L A - - - -
Solid Waste Treatment Project in Southern Vietnam L A - - - -
Song Hau 1 Coal Fired Power Plant Project and its related common infrastructures L A ·Preparatory Survey (Mar. 2012)
- - -
Trung Luong - My Thuan Expressway Project L A - - - -
Urban Development with Above-and Under-Ground Combined Structures at Ben Thanh Station Area in Ho Chi Minh City L A ·Preparatory Survey (Mar. 2012)
- - -
Wastewater Management and Solid Waste Management for Da Nang City L A - - - -
Water Supply and Sewerage Treatment System Project in Phu Quoc Island, Kien Gian Province L A - - - -
Feasibility Survey for SDGs Business on Simon Bamboo Production and Distribution to Prevent Deforestation by Slash-and-burn Agriculture SDGs-FS/BOP-PS B - - - -
Project for Agriculture Development in Phan Ri – Phan Thiet Phase II TCP B ·IEE Report (PDF/727KB)
·
·
·
·Environmental Review (In Japanese)(PDF/340KB)
·Monitoring Report (Sep. 2018) (PDF/223KB)
The Study for Improvement of Living Conditions for Workers around Industrial Zones TCDP B ·-
- ·-
·-
Ultra-High Voltage Transmission Network TCDP B - - - -
BOP business on the production of bio ethanol L B - - - -
Can Tho City Water Supply Improvement Project L B - - - -
Cho Ray Second Hospital Development Project L B - - - -
Coffee Value Chain Enhancement Project L B ·N/A
·EIAIEE (Mar. 19, 2017) (PDF/4.41MB)
- -
Da Nang City Hoa Lien Water Supply Project L B ·Preparatory survey for Da Nang City Hoa Lien Water Supply Project
·N/A
·N/A
·N/A
Da Nhim Hydropower Plant Expansion Project L B ·N/A
·N/A
·Environment Review (PDF/109KB)
-
Danang City Water Environment Improvement Project L B - - - -
Engineering Service for Ha Long City Water Environment Improvement Project L B - - - -
Firefighting and Rescue Improvement Project L B - - - -
Ha Nam Investment Climate Improvement Project L B - - - -
Hanoi City Yen Xa Sewerage System Project L B ·N/A
·N/A
·Environmental Review (PDF/42KB)
-
Ho Chi Minh City Water Distribution Improvement Project Applying Japanese Water Distribution Management Technology L B - - - -
North Nghe An Irrigation System Upgrading Project L B ·N/A
·N/A
·Environmental Review (PDF/48KB)
-
Northwest Area Rural Development Project L B - - - -
Phap Van-Cau Gie Expressway Project L B - - - -
Preparatory Survey on Second Danang Port Improvement Project L B - - - -
Project for Disaster and Climate Change Countermeasures Using Earth Observation Satellite L B - - - -
Project for Upgrading Infrastructure For Agriculture Enhancement in Lam Dong Province L B ·N/A
- - -
Public Transport Infrastructure Improvement Project in Binh Duong Province L B - - - -
Rental Factory Development Project for SMEs L B ·Preparatory Survey(May 19, 2015)(PDF/4.82MB)
·N/A
- ·Report (PDF/282KB)
Rental Factory Project for SMEs in Vietnam (Vinh Phuc Province) L B - - - -
Southern Binh Duong Province Water Environment Improvement Project - Phase II L B ·N/A
·N/A
·Environmental Review (PDF/41KB)
-
Sustainable Forest Management Project in Northwest Sub-region L B - - - -
The PPP Duong River Water Supply System Project L B - - - -
Transit Oriented Development of Suoi Tien Terminal Station Area and My Phuoc-Tan Van Highway BRT Development Project L B - - - -
Utility Management of Industrial Parks and Water Supply Project- Sub-Project 1: Utility Management of Thuan Dao II IP L B - - - -
Utility Management of Industrial Parks and Water Supply Project- Sub-Project 2: Utility Management of Phu An Thanh IP L B - - - -
Utility Management of Industrial Parks and Water Supply Project- Sub-Project 3: Water Supply to Ben Luc District L B - - - -
Water Supply Project in New City and Industrial Parks in Northern Part of Binh Duong Province L B - - - -
Water supply improvement Project in Ho Chi Minh City L B - - - -
An Duong Water Treatment Plant Upgrade Investment Project GA B ·Preparatory Survey(PDF/9.07MB)
·Appendix(PDF/7.48MB)
·N/A
·Environmental Review (In Japanese)(PDF/187.7KB)
-
Water Quality Improvement Project for Japanese Bridge Area in Hoi An City GA B ·Preparatory Survey(PDF/10MB)
·EPC(Apr.23,2018) (PDF/1.83MB)
·Environmental Review (In Japanese)(PDF/226KB)
·Environmental Monitoring Report (Vietnamese) (PDF/5.98MB)
Pilot Survey For Disseminating Smalland Medium Enterprises Technologies For SF Double Shell Tank For Avoiding Leakage of Hazardous Objects SSM-VS B ·Final Report (In Japanese)
·Final Report Annex (In Japanese)
·N/A
·Environmental Review (In Japanese) (PDF/143KB)
·N/A
Pilot Survey for Disseminating SME’s Technologies for Medical Waste Disposal System in Hai Phong City SSM-VS B ·Final Report part 1 (In Japanese) (PDF/8.30MB)
·Final Report part 2 (In Japanese) (PDF/6.41MB)
·N/A
·Result of Review (PDF/159KB)
·Result of Monitoring (In Japanese) (PDF/15.4MB)
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Improvement of Domestic Wastewater Treatment through Introducing Johkasou SSM-VS B - - - -
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Municipal Solid Waste Incineration and Landfill Rehabilitation SSM-VS B - - ·Environmental Review (In Japanese) (PDF/168KB)
-
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Soil Improvement Technology for Mekong Delta Waterway Revetment Construction SSM-VS B - - - -
Verification Survey with the Private Sector for Disseminating Japanese Technologies for the Advanced Waste Water Treatment System Suited for High BOD SSM-VS B - - ·Environmental Review (In Japanese) (PDF/179KB)
-
Feasibility Survey for Introduction of Soil Improvement Technology for Mekong Delta Waterway Revetment Construction SSM-FS B ·Final Report (in Japanese)(PDF/9.35MB)
·N/A
·N/A
·N/A
Feasibility Survey for Disseminating of TNF Method (Direct Foundation Structure with Ground Improvement) into the Soft-Ground Area SSM-FS B ·Final Report (in Japanese)(PDF/8.12MB)
·N/A
·N/A
·N/A
Feasibility Survey for Environmental Improvement by Recycling Organic Waste Including Domestic Waste SSM-FS B ·Final Report (in Japanese)(PDF/8.1MB)
·N/A
·N/A
·N/A
Feasibility Survey for Highly Concentrated Organic Wastewater and High Salinity Organic Wastewater Treatment with Natural Minerals SSM-FS B ·Final Report (in Japanese)(PDF/3.91MB)
·N/A
·N/A
·N/A
Feasibility Survey for Improvement of domestic wastewater treatment through transferring operation, maintenance and management techniques for “Johkasou” SSM-FS B ·Final Report (in Japanese)(PDF/3.10MB)
·N/A
·N/A
·N/A
Feasibility Survey for Improving Safety of the Tunnel Excavation Works and Extending Service Life of the Existing Tunnel by AGF Method and Injecting Urethane Chemical SSM-FS B ·Final Report (in Japanese) (PDF/9.9MB)
·Final Report (in Japanese) (PDF/10.1MB)
·Final Report (in Japanese) (PDF/22.2MB)
·N/A
·N/A
·N/A
Feasibility Survey for logistics services for the Cai Mep port activation SSM-FS B ·Final Report (in Japanese)(PDF/8.42MB)
·N/A
·N/A
·N/A
Feasibility Survey for the Advanced Waste Water Treatment System Suited for High BOD Waste Water SSM-FS B ·Final Report (in Japanese)(PDF/9.13MB)
·N/A
·N/A
·N/A
Feasibility Survey for the Spread of Environmental Friendly and High-spec Industrial Wastewater Treatment Equipment SSM-FS B ·Final Report (in Japanese)(PDF/3.73MB)
·N/A
·N/A
·N/A
Second Power Transmission and Distribution Network Development Project L FI ·N/A
·N/A
·Environmental Review(PDF/122KB)
·N/A
Second Transport Sector Loan for National Road Network Improvement L FI - ·N/A
·Environmental Review (PDF/48.0KB)
·Annual Environmental and Social Performance Report (PDF/479KB)

PAGE TOP

Copyright © Japan International Cooperation Agency