Japan International Cooperation Agency
Share
  • 日本語
  • English
  • Français
  • Espanol
  • Home
  • About JICA
  • News & Features
  • Countries & Regions
  • Our Work
  • Publications
  • Investor Relations

Information Disclosure under new Guidelines

South Asia

Projects classified as Category A, B, or FI

  • (TCP) Technical Cooperation Project
  • (TCDP) Technical Cooperation for Development Planning
  • (L) ODA Loans / Private Sector Investment Finance
  • (GA) Grant Aid
  • (CP) Collaboration Program with the Private Sector for Disseminating Japanese Technology
  • (SSM-VS) Verification Survey with the Private Sector for Disseminating Japanese Technologies
  • (SSM-FS) Feasibility Survey with the Private Sector for Utilizing Japanese Technologies in ODA projects
  • (SDGs-FS/BOP-PS) Feasibility Survey for SDGs Business / Preparatory Survey for BOP Business
  • (SDGs-BMFS) SDGs Business Model Formulation Survey with the Private Sector
  • (SDGs-BVS) SDGs Business Verification Survey with the Private Sector
  • (O) Others
  • EIA: Environmental Impact Assessment
  • EPC: Environmental Permit Certificate
  • RAP: Resettlement Action Plan
  • IPP: Indigenous Peoples Plan

Please click on “Project Name” to view Past Results of Monitoring.

Afghanistan

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
The Project for Capacity Development and Institutional Strengthening of Ministry of Agriculture, Irrigation and Livestock(MAIL) TCP B - - - -
The Project for Development of Water Supply Facilities in Dehsabz South Area GA B ·Outline Desing Report Volume1(PDF/4.06MB)
·Volume2(PDF/4.05MB)
·N/A
·Environmental Review (In Japanese)(PDF/220.8KB)
-
The Project for Improvement of existing Bamyan Airport GA B ·Preparatory survey report on the project for improvement of Bamyan Airport in the Islamic Republic of Afghanistan
·
- ·Monitoring Result (Apr 2018) (PDF/2.19MB)
The Project for Rehabilitation and Expansion of Aircraft Parking Aprons at Kabul International Airport GA B ·Preparatory survey on the project for rehabilitation and expansion of aircfraft parking aprons at Kabul International Airport in the Islamic Republic of Afghanistan
- - ·Monitoring Result (Apr 2018) (PDF/1.68MB)
The Project for Rehabilitation and Expansion of Aircraft Parking Aprons at Kabul International Airport (Phase2) GA B ·Preparatory survey report on the project for rehabilitation and expansion of aircraft parking aprons at Kabul international airport (phase 2) in Islamic Republic of Afghanistan
- - ·Monitoring Report (Apr 2018) (PDF/1.68MB)
The Project for Rehabilitation of Community Infrastructure in Nangarhar GA B - - - -
The Project for Rehabilitation of Small Irrigation Facilities and Village Accessibility in Dehsabz Area, Kabul Province GA B - - - -
The Project for Strengthening Security in Kabul International Airport GA B ·Preparatory survey report on the project for strengthening security at Kabul international airport in the Islamic Republic of Agfhanistan
·N/A
- -

Bangladesh

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Araihazar Economic Zone Development Project (Tentative) L A - ·EIA(June 13, 2018)
·RAP(June 18, 2018)
- -
Chattogram-Cox's Bazar Highway Improvement Project L A - - - -
Dhaka Mass Rapid Transit Development Project L A ·Report (Dec. 5, 2011) (PDF/1.09MB)
·EIA (July 28, 2011) (PDF/3.84MB)
·EPC (July 28, 2011) (PDF/2.70MB)
·RAP (July 28, 2011) (PDF/6.87MB)
·EIA (Supplementary EIA Report for Motijheel to Kamalapur Extension) (Aug. 11, 2021) (PDF/5.37MB)
·EPC (ECC) (Aug. 11, 2021) (PDF/3.21MB)
·RAP (RAP-III for MRT Line 6 from Motijheel to Kamalapur) (Aug. 11, 2021) (PDF/3.70MB)
·Environmental Review (PDF/71.5KB)
·N/A
Dhaka Mass Rapid Transit Development Project (Line 1) L A ·Draft Final Report of Preparatory Study (Nov. 21, 2018) (PDF/62.2MB)
·EIA (Nov. 21, 2018) (PDF/28.3MB)
·ECC (Nov. 21, 2018) (PDF/1.09MB)
·RAP (Nov. 21, 2018) (PDF/4.21MB)
·Environmental Review (PDF/226KB)
-
Dhaka Mass Rapid Transit Development Project (Line 5 Northern Route) L A ·Draft Final Report of Preparatory Survey (Dec. 6, 2017) (PDF/27.9MB)
·RAP(Dec. 6, 2017) (PDF/6.95MB)
·EIAMain Report (Dec. 6, 2017) (PDF/12.0MB)
·EIAAnnex (Dec. 6, 2017) (PDF/14.0MB)
·ECC (Dec. 6, 2017) (PDF/640KB)
- -
Jamuna Railway Bridge Construction Project L A - ·ECC (Dec. 6, 2017) (PDF/1.17MB)
·EIA(Dec. 6, 2017) (PDF/13.8MB)
·Environmental Review (PDF/142KB)
-
Matarbari Port Development Project L A ·Preparatory Survey Volume 1 (Dec. 21, 2018) (PDF/17.3MB)
·Volume 2 (Dec. 21, 2018) (PDF/22.9MB)
·Volume 3 (Dec. 21, 2018) (PDF/10.5MB)
·Volume 4 (Dec. 21, 2018) (PDF/22.5MB)
·Volume 5 (Dec. 21, 2018) (PDF/18.3MB)
·Volume 6 (Dec. 21, 2018) (PDF/25.5MB)
·EIA Main report (Port) (Dec. 26, 2018) (PDF/16.8MB)
·EIA Appendix (Port) (Dec. 26, 2018) (PDF/15.9MB)
·EIA Main report (Road) (Dec. 26, 2018) (PDF/23.9MB)
·EIA Appendix (Road) (Dec. 26, 2018) (PDF/14.5MB)
·EPC (Port) (Dec. 26, 2018) (PDF/1.88MB)
·EPC (Road) (Dec. 26, 2018) (PDF/2.89MB)
·RAP Main report (Port) (Dec. 26, 2018) (PDF/4.52MB)
·RAP Appendix (Port) (Dec. 26, 2018) (PDF/1.02MB)
·RAP Main report (Road) (Dec. 26, 2018) (PDF/6.16MB)
·RAP Appendix (Road) (Dec. 26, 2018) (PDF/1.49MB)
·Environmental Review(PDF/211KB)
-
Matarbari Ultra Super Critical Coal-Fired Power Project L A ·Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh Final Report on Power Plant / Port / Transmission Line / Access Road / Execution Survey of Natural Condition(Mar. 31, 2015) Book 1 (PDF/16,372KB)
·Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh Final Report on Power Plant / Port / Transmission Line / Access Road / Execution Survey of Natural Condition(Mar. 31, 2015) Book 2 (PDF/6,814KB)
·Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh Final Report on Power Plant / Port / Transmission Line / Access Road / Execution Survey of Natural Condition(Mar. 31, 2015) Book 3 (PDF/35,139KB)
·EC Access Road (Nov. 19, 2013) (PDF/224KB)
·EC Access Road (Package 3.3) (Apr. 27, 2020) (PDF/151KB)
·EC Transmission Lines (Nov. 19, 2013) (PDF/130KB)
·EIA Access Road (Nov. 19, 2013) (PDF/9.23MB)
·EIA Access Road (Package 3.3) (Apr. 27, 2020) (PDF/8.80MB)
·EIA Transmission Lines (Nov. 19, 2013) (PDF/5.19MB)
·RAPAccess Road (Mar. 8, 2018) (PDF/4.75MB)
·EIA (Oct. 28, 2013) (PDF/12.2MB)
·EIA Approval (Oct. 28, 2013) (PDF/679KB)
·RAP (Sep. 14, 2020) (PDF/3.33MB)
·RAP (Oct. 28, 2013) (PDF/951KB)
·EIARural Electrification (MAr. 8, 2021) (PDF/12.1MB)
·EIATransmission Line (Mar. 8, 2021) (PDF/18.1MB)
·Environmental Review (PDF/185KB)
-
Preparatory Survey on Ocean Front Economic Zone Development Project in Bangabandhu Sheikh Mujib Shilpa Nagar L A - - - -
Sirajganj Combined Cycle Power Plant Project L A - ·EIA(Nov.22,2016) (PDF/16.6MB)
· (PDF/103MB)
·EIA Approval (PDF/610KB)
- -
The Kanchpur, Meghna, and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation Project (I) L A ·Preparatory survey for Dhaka-Chittagong national highway No.1 bridge construction and rehabilitation project (project name : the Kanchpur, Meghna, Gumti 2nd bridges construction and existing bridges rehabilitation project) : final report (Feb. 27, 2017) (Vol.1)
·Preparatory survey for Dhaka-Chittagong national highway No.1 bridge construction and rehabilitation project (project name : the Kanchpur, Meghna, Gumti 2nd bridges construction and existing bridges rehabilitation project) : final report (Feb. 27, 2017) (Vol.2)
·Preparatory survey for Dhaka-Chittagong national highway No.1 bridge construction and rehabilitation project (project name : the Kanchpur, Meghna, Gumti 2nd bridges construction and existing bridges rehabilitation project) : final report (Feb. 27, 2017) (Vol.2)
·EIA (Nov. 16, 2012) (PDF/3.28MB)
·ECC (Nov. 16, 2012) (PDF/588KB)
·RAP (Nov. 16, 2012) (PDF/8.35MB)
·Environmental Review (PDF/197KB)
·N/A
Capacity Development Project for Participatory Water Resource Management through Integrated Rural Development TCP B - ·N/A
- -
Capacity Development Project for Participatory Water Resources Management through Integrated Rural Development TCP B - - - ·Environmental Monitoring Report (PDF/134KB)
The Project for Building Disaster Resilience Organization on Comprehensive River Maintenance with Development of Sustainable Riverbank Protection and Institution Technology TCP B - - - -
Project for Development Study and Capacity Enhancement of Bangladesh Economic Zone Development Plan Authority TCDP B - - - -
The Integrated Energy and Power Master Plan Project TCDP B ·Environmental Social Considerations in Detailed Planning Survey (PDF/1.12MB)
·N/A
- -
The Project for Capacity Development of Management for Sustainable Water Related Infrastructure TCDP B - - - -
The Project for Developing Inclusive City Government for City Corporations TCDP B - - - -
Bangladesh FSRU Project L B - - - -
Cross-Border Road Network Improvement Project(Bangladesh) L B - ·
·Environmental Review
-
Dhaka Underground Substation Construction Project L B - - ·Environmental Review(PDF/143KB)
-
Dhaka-Chittagong Main Power Grid Strengthening Project L B - - ·Environmental Review(PDF/205KB)
-
Haor Flood Management and Livelihood Improvement Project L B ·Preparatory survey on upper Meghna river basin watershed management improvement project in the People's Republic of Bangladesh : final report (Vol.1)
·(Vol.2)
- ·Environmental Review (PDF/68KB)
-
Hazrat Shahjalal International Airport Expansion Project L B - ·EIA(Jun. 23, 2020) (PDF/14.3MB)
·EPC(Jun. 23, 2020) (PDF/239KB)
·Environmental Review (PDF/315KB)
-
Inclusive City Governance Project L B - - ·Environmental Review (PDF/70KB)
-
Karnaphuli Water Supply Project (Phase2) L B - - ·Environmental Review (PDF/70KB)
-
National Power Transmission Development Project L B - - ·Environmetal Review(PDF/76KB)
-
Natural Gas Efficiency Project L B ·Preparatory Survey (PDF/5.95KB)
- ·Environmental Review (PDF/73KB)
-
Preparatory Survey for the Construction and Operation of Imported Coal Transshipment Terminal Project in Matarbari Area L B - - - -
Southern Chattogram Regional Development Project L B - - - -
Urban Development and City Development Project L B - - - -
Western Bangladesh Bridges Improvement Project L B - - ·Environmental Review (PDF/105KB)
-
Poverty Reduction Efforts GA B - - - -
The Fourth Primary Education Development Program GA B - - - -
The Third Primary Education Development Programme GA B - - - -
SDGs Business Model Formulation Survey with the Private Sector for Establishment of Efficient and Hygienic Waste Storage System SDGs-BMFS B - ·N/A
·N/A
·N/A
SDGs Business Model Formulation Survey with the Private Sector for Introduction of Water Recycling Technology for Textile Dyeing Industry SDGs-BMFS B - ·N/A
·N/A
·N/A
Disaster Risk Management Enhancement Project L FI ·The Praparatory Survey on the Capacity Enhancement on Disaster Risk Reduction, Emergency Response and Recovery Project in the People's Republic of Bangladesh Final Report (Vol. 1)
·(Vol. 2)
·(Vol.3-1)
·(Vol.3-2)
- ·Environmental Review (PDF/114KB)
-
Energy Efficiency and Conservation Promotion Financing Project L FI ·Preparatory Survey(PDF/3.36MB)
- ·Environmental Review (PDF/136KB)
-
Energy Efficiency and Conservation Promotion Financing Project (Phase 2) L FI - - ·Environmental Review (PDF/202KB)
-
Food value chain improvement project L FI - - - -
Foreign Direct Investment Promotion Project L FI - ·EIA(June13, 2018) (PDF/17.3MB)
·RAP(June 18, 2018) (PDF/2.37MB)
·Result of Envionmental and Social consideration review (PDF/251KB)
·
-
Health and Population Sector Development Program (1) L FI ·N/A
- ·Environmental Review (PDF/96KB)
-
Maternal, Neonatal and Child Health (MNCH) and Health System Improvement Project L FI ·The preparatory survey on maternal, neonatal, and child health improvement project : health, population and nutrition sector development program : phase 2 : in the People's Republic of Bangladesh : final report
- ·Environmental Review (PDF/205KB)
-
Northern Bangladesh Integrated Development Project L FI - - ·Environmental Review (PDF/77KB)
-
Renewable Energy Development Project L FI ·Preparatory Survey (PDF/4.21MB)
- ·Environmental Review (PDF/68KB)
-
Small Scale Water Resources Development Project (Phase 2) L FI - - ·Environmental Review (PDF/146KB)
-
Upazila Governance and Development Project L FI ·The Study of the Upazila Governance and Development Project in the People’s Republic of Bangladesh
- ·Environmental Review (PDF/219KB)
-
Urban Building Safety Project L FI ·N/A
·N/A
·Environmental Review (PDF/182KB)
-

Bhutan

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
the Project on Power System Master Plan 2040 TCDP A ·ESC in Detailed Planning Survey (PDF/1.09MB)
·RD (PDF/878KB)
- - -
Project for Master Plan / Baseline Study of Mining and Mineral Deposits in Bhutan TCP B - - - -
Project for Formulation of Comprehensive Development Plan for Bhutan 2030 TCDP B ·RD (PDF/1.25MB)
·ESC in detailed planning survey (PDF/446KB)
- - -
Project for Master Plan Study on Road Slope Management in Bhutan TCDP B - - - -
The Project for Reconstruction of Bridges on Primary National Highway No. 4 GA B ·Report in Japanese(Nov. 1, 2016)(PDF/10.3MB)
·N/A
- -
The Project for Reconstruction of Bridges on Primary National Highway No.1 GA B ·Report (Apr. 1, 2015)(PDF/10.9MB)
·N/A
- -
The Project for the Rehabilitation of Taklai Irrigation System in Sarpang District GA B - - - ·Environmental Monitoring (PDF/539KB)
Verification Survey with the Private Sector for Disseminating Japanese Technologies for The small sewerage by energy-saving wastewater treatment technology named Dojo-Joka System SSM-VS B ·Final Report (In Japanese)
·N/A
·Environmental Review (In Japanese) (PDF/230KB)
·Final Report (In Japanese)
Feasibility Survey for road-side slope disaster countermeasure technologies and methods. SSM-FS B ·final report in japanese
·N/A
·N/A
·N/A

India

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Ahmedabad Metro Rail Project L A - ·EIA (Nov. 25, 2014) (PDF/16.5MB)
·SIA (Nov. 25, 2014) (PDF/17.1MB)
·EPC (Nov. 25, 2014) (PDF/37KB)
·Environmental Review (PDF/170KB)
-
Bengaluru Metro Project (Phase2) L A - ·EPC(November. 10, 2020) (PDF/299KB)
·EIA2A (November. 10, 2020) (PDF/19.6MB)
·RAP2A (November. 10, 2020) (PDF/6.89MB)
·EIA2B (November. 10, 2020) (PDF/19.0MB)
·RAP2B (November. 10, 2020) (PDF/5.32MB)
·EIAR6 (November. 10, 2020) (PDF/5.13MB)
·EIAR6 Addendum (November. 10, 2020) (PDF/1.09MB)
·RAPR6 (November. 10, 2020) (PDF/4.77MB)
·RAPAll Addendum (November. 10, 2020) (PDF/516KB)
- -
Bengaluru Peripheral Ring Road L A - ·EIA (Nov. 20, 2014) (PDF/15.7MB)
·RAP(Nov. 5, 2015) (PDF/4.87MB)
- -
Chennai Metro Project Phase 2 L A - ·EIA (Nov.21, 2017) (PDF/2.19MB)
·RAP(Nov. 21, 2017) (PDF/10.9MB)
·EPC (Nov.21, 2017) (PDF/46.4KB)
·
- -
Chennai Peripheral Ring Road Project L A ·Preparatory Survey (in Japanese) (Aug. 28, 2018) (PDF/17.3MB)
·EIA(Aug. 28, 2018) (PDF/21.7MB)
·RAP(Aug. 28, 2018) (PDF/77.9MB)
·EPC(Aug. 28, 2018) (PDF/52.0MB)
- -
Delhi Mass Rapid Transport System Project Phase 3 L A - ·EIA(Aug. 23, 2012) (PDF/21.0MB)
·EPC(Aug. 23, 2012) (PDF/29KB)
·RAP (Aug. 23, 2012) (PDF/2.46MB)
·EIA (Mar. 31, 2018) (PDF/2.25MB)
· SIA (Mar. 31, 2018) (PDF/2.02MB)
·Environmental Review (PDF/88KB)
·Monitoring Results (2Q FY 2020) (PDF/321KB)
Delhi Mass Rapid Transport System Project Phase 4 L A - ·EIA(Jun. 18, 2020) (PDF/5.45MB)
·RAP(Jun. 18, 2020) (PDF/9.49MB)
·EPC(Jun. 18, 2020) (PDF/425KB)
- -
Gurgaon- Bawal Mass Rapid Transit System Project L A - - - -
Mumbai Metro Line 3 Project L A - ·RAPSIA(Mar.4,2021) (PDF/7.80MB)
·EIAEIA-Part1(Oct. 23, 2020) (PDF/7.64MB)
·EIAEIA-Part2(Oct. 23, 2020) (PDF/2.56MB)
·RAPSIA(Jan. 4, 2018) (PDF/6.55MB)
·EIAEIA(Sep,2012) (PDF/10.3MB)
·
·
·Environmental Review (PDF/183KB)
·
·Environmental Monitoring Result(2QFY2020) (PDF/1.12MB)
Mumbai Trans Harbour Link Project L A ·Preparatory Survey_Main 1 (PDF/9.46MB)
·Preparatory Survey_Main 2 (PDF/8.42MB)
·Preparatory Survey_Main 3 (PDF/6.10MB)
·Preparatory Survey_Appendix 1 (PDF/9.21MB)
·Preparatory Survey_Appendix 2 (PDF/9.76MB)
·Preparatory Survey_Appendix 3 (PDF/4.92MB)
·Preparatory Survey_Appendix 4 (PDF/10.4MB)
·EIA(Nov.26, 2015) (PDF/23.0MB)
·EPC(Nov.26, 2015) (PDF/1.84MB)
·RAP(Jan.7, 2016) (PDF/22.9MB)
·Environmental Review (PDF/178KB)
·(Oct.25, 2018) (PDF/36.0KB)
New Dholera international airport development project in the Republic of India L A - - - -
North East Road Network Connectivity Improvement Project (Phase 5) L A ·Preparatory Survey Volume 1 (Feb. 16, 2021) (PDF/15.5MB)
·Preparatory Survey Volume 2 (Feb. 16, 2021) (PDF/29.3MB)
·EIA(Aug. 21, 2020) (PDF/13.6MB)
·EPC(Authorization letter)(Aug. 21, 2020) (PDF/361KB)
·RAP(Supplemental Social Assessment Report)(Feb. 10, 2021) (PDF/5.02MB)
- -
North East Road Network Connectivity Improvement Project Phase 2 L A ·(Jul. 7, 2017) NH40 (PDF/24.7MB)
·(Jul. 7, 2017)NH54 BYPASSES (PDF/8.15MB)
·EIA(Jul. 3, 2017) NH40 (PDF/11.5MB)
·EIA(Jul. 3, 2017) NH54 BYPASSES (PDF/8.95MB)
·EPC(Jul. 3, 2017) (PDF/315KB)
·RAP(Jul. 7, 2017) NH40 (PDF/6.40MB)
·RAP(Jul. 7, 2017)NH54 BYPASSES (PDF/1.57MB)
- ·Result of Monitoring (PDF/565KB)
North East Road Network Connectivity Improvement Project Phase 3 L A ·Preparatory Survey (June. 12, 2018) (PDF/12.6MB)
·EIA(May. 22, 2018) (PDF/4.56MB)
·RAP(June. 12, 2018) (PDF/1.99MB)
·EPC(May. 22, 2018) (PDF/32.0KB)
- -
North East Road Network Connectivity Improvement Project Phase 4 L A - ·EPC(Nov.20.2019) (PDF/130KB)
·EIA(Nov.20.2019) (PDF/4.98MB)
·RAP(Jan.30.2020) (PDF/4.31MB)
- -
North East Road Network Connectivity Improvement Project Phase 6 L A - ·EPC(July 5, 2021) (PDF/313KB)
·EIA(Dec.1,2020) (PDF/16.1MB)
- -
North East Road Network Connectivity Improvement Project Phase I L A ·Preparatory Survey (Oct. 23, 2015) (PDF/19.7MB)
·EIA(Nov. 20, 2015) (PDF/7.09MB)
·EPC(Nov. 20, 2015) (PDF/275KB)
·RAP(Oct. 23, 2015) (PDF/7.94MB)
·Environmental Review (PDF/195KB)
·Result of Monitoring (PDF/565KB)
Project for Construction of Mumbai-Ahmedabad High Speed Rail L A ·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 1 (PDF/5.17MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 2 (PDF/12.9MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 3 (PDF/20.5MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 4 (PDF/26.8MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 5 (PDF/28.7MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 6 (PDF/7.20MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 7 (PDF/14.7MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 8 (PDF/23.7MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 9 (PDF/16.2MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 10 (PDF/9.43MB)
·EIAVol. 1 (September 14, 2018) (PDF/11.8MB)
·EIAVol. 2 (September 14, 2018) (PDF/17.4MB)
·RAP(September 14, 2018) (PDF/4.80MB)
·IPP(September 14, 2018) (PDF/4.75MB)
·(September 14, 2018) (PDF/58.9KB)
·Environmental Review (In Japanese) (PDF/313KB)
·RAP External Monitoring (Oct,2021) (PDF/13.1MB)
Project for the Construction of Turga Pumped Storage L A ·Preparatory Survey(July. 4, 2018) (PDF/27.0MB)
·EIAEIA 1(July. 4, 2018) (PDF/16.2MB)
·EIAEIA 2(July. 4, 2018) (PDF/2.01MB)
·EIAEIA 3(July. 4, 2018) (PDF/1.79MB)
·EIAEIA 4(July. 4, 2018) (PDF/6.91MB)
·EPCEPC(Environmental Clearance Certificate) (July. 4, 2018) (PDF/1.99MB)
·RAPRAP(Abbreviated Resttlement Action Plan) (July. 4, 2018) (PDF/1.33MB)
- -
Rengali Irrigation Project LBC-II, Phase II L A - ·EIA (Nov. 20, 2014) (PDF/30.3MB)
·EPC (Nov. 20, 2014) (PDF/10.2MB)
·RAP (Nov. 20, 2014) (PDF/23.3MB)
·Environmental Review (PDF/115KB)
·Result of monitoring (Sep. 2020) (PDF/5.33MB)
Ship Recycling Yard Improvement Project L A ·Preparatory Survey (July 31, 2017) (PDF/12.6MB)
·EIA(Nov. 16, 2016) (PDF/63.6MB)
·EPC(Nov. 16, 2016) (PDF/1.71MB)
- -
Tuticorin Port Outer Harbour Development Project L A - - - -
Urban Railway Project in Pune City L A ·N/A
- - -
Comprehensive Traffic and Transportation Study for the Andhra Pradesh Capital Region Development Authority Jurisdiction TCDP B - - - -
The Study on Development and Management of Land and Water Resources for Sustainable Agriculture in Mizoram TCDP B - - - -
Andhra Pradesh Irrigation and Livelihood Improvement Project (Phase 2) L B - - - -
Assam Health System Strengthening Project L B - - - -
Bengaluru Water Supply and Sewerage Project (Phase 3) L B - - - -
Chennai Seawater Desalination Plant Project L B - - - -
Delhi Water Supply Improvement Project L B ·N/A
- ·Environmental Review (PDF/51KB)
-
Guwahati Sewerage Project L B ·N/A
- ·Environmental Review (PDF/32KB)
-
Himachal Pradesh Crop Diversification Promotion Project (Phase 2) L B - - - -
Imphal Water Supply Improvement Project L B - - - -
Madhya Pradesh Rural Water Supply Project L B - - - -
Madhya Pradesh Transmission System Modernization Project L B ·N/A
- ·Environmental Review (PDF/160KB)
-
Nellore Water Supply and Sewerage Project L B - - - -
Odisha Transmission System Improvement Project L B - - ·Environmental Review (PDF/115KB)
-
Preparatory Survey on Next Generation Medical Logistics Centre Project L B - - - -
Project for Establishment of Mizoram State Super-Specialty Cancer and Research Centre L B - - - -
Project for Pollution Abatement of River Mula-Mutha in Pune L B ·Preparatory Survey (PDF/8.75MB)
·Preparatory Survey (PDF/3.74MB)
- ·Environmental Review (PDF/94KB)
-
Project for Pollution Abatement of River Nag at Nagpur L B - - - -
Rajasthan Hybrid Renewable Energy Project L B - ·EIA(Sep. 14, 2020) (PDF/19.1MB)
·EPC(Sep. 14, 2020) (PDF/20.5KB)
- -
Rajasthan Rural Water Supply and Fluorosis Mitigation Project (Nagaur) L B ·N/A
- ·Environmental Review (PDF/48KB)
-
Rajasthan Rural Water Supply and Fluorosis Mitigation Project (Phase 2) L B - - - -
Rajasthan Water Sector Livelihood Improvement Project L B - - ·Environmental Review (PDF/170KB)
-
Ranchi Sewerage Project L B - - - -
Tamil Nadu Transmission System Improvement Project L B ·N/A
- ·Environmental Review (PDF/46KB)
-
Tamil Nadu Urban Health Care Project L B - - ·Environmental Review (PDF/172KB)
-
The Project for the Setting up of All India Institute of Medical Sciences Madurai L B - - - -
Transmission System Strengthening Works in Madhya Pradesh L B - - ·Environmental Review (PDF/160KB)
-
Uttarakhand Integrated Horticulture Development Project L B - - - -
The Project for Countermeasure Construction for the slope failures on National Highway 55 GA B - - - -
Feasibility Survey for Holistic Management System of Sewage Treatment Plant with Remote Monitoring Technology in India. SSM-FS B ·Final Report
·N/A
·N/A
·N/A
Feasibility Survey for environmentally friendly toilet in India SSM-FS B ·final report in Japanese part1
·final report in Japanese part2
·N/A
·N/A
·N/A
Climate Change Management Project L FI - - - -
Climate Change Mitigation Project L FI - - - -
Himachal Pradesh Forest Ecosystems Management and Livelihoods Improvement Project L FI - - - -
Initiative for Horticulture Intensification by Micro Drip Irrigation in Jharkhand L FI - - ·Environmental Review (PDF/181KB)
-
Micro, Small and Medium Enterprises Energy Saving Project Phase 2 L FI ·N/A
- ·Environmental Review (PDF/85KB)
-
Micro, Small and Medium Enterprises Energy Saving Project Phase 3 L FI - - ·Environmental Review (PDF/44KB)
-
Nagaland Forest Management Project L FI - ·N/A
·Environmental Review (PDF/159KB)
-
New and Renewable Energy Development Project L FI ·N/A
- ·Environmental Review (PDF/37KB)
-
New and Renewable Energy Development Project - Phase 2 L FI - - ·Environmental Review (PDF/43KB)
-
Odisha Forestry Sector Development Project (Phase II) L FI - - ·Environmental Review (PDF/231KB)
-
PPP Infrastructure Financing Project L FI - - ·Environmental Review (PDF/138KB)
-
Project for Ecosystem Management in Gujarat L FI - - - -
Project for Sustainable Community Forest Management in Meghalaya L FI - - - -
Promotion of small and medium-sized enterprises through impact investment L FI - ·N/A
- -
Tamil Nadu Biodiversity Conservation and Greening Project phase 2 L FI - - - -
Telangana Startup and Innovation Ecosystem Strengthening Project L FI - - - -
Tripura Sustainable Forest Management Project L FI - - - -
Uttarakhand Forest Resource Management Project L FI - - ·Environmental Review (PDF/97KB)
-
West Bengal Forest and Biodiversity Conservation Project L FI ·Preparatory Survey (PDF/3.91MB)
- ·Environmental Review (PDF/49KB)
-
West Bengal Piped Water Supply Project (District of Purulia) L FI - - ·Environmental Review (PDF/48KB)
-

Maldives

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Project for Safe and Resilient Islands against Climate Change and Disaster TCP B - - - -
Project for the Formulation of Master Plan for Sustainable Fisheries TCDP B ·R/D (PDF/348KB)
·ESC in Detailed Planning Survey (PDF/665KB)
·N/A
·N/A
·N/A
COVID-19 Crisis Response Emergency Support Loan L B - - - -
Digital Terrestrial Television Broadcasting Network Development Project GA B - - - -
Feasibility Survey for Solid Waste Disposal System with Thermal Decomposition Furnace SSM-FS B ·final report in japanese
·N/A
·N/A
·N/A
Building Climate Resilient Safer Islands in the Maldives O B ·Environmental and Social Management Framework (PDF/2.26MB)
·Stakeholder Engagement Plan (PDF/824KB)
- - -
Tourism Sector Support Project L FI ·N/A
- - ·N/A

Nepal

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Project for the Improvement of Suryabinayak−Dhulikhel Road L A ·Preparatory Survey (October. 19, 2018)(PDF/34.8 MB)
·EIA(October. 19, 2018) (PDF/51.2MB)
·EPC(October. 19, 2018) (PDF/444KB)
·RAP(Nov. 20, 2018) (PDF/3.41MB)
- -
Project for Development of Master Plan for Wastewater Management in Pokhara Metropolitan City TCDP B ·Detailed Planning Survey (PDF/1.09MB)
- - -
Project on Integrated Power System Development Plan in Nepal TCDP B ·Minutes of Meetings (PDF/1.06MB)
·Environmental and Social Considerations Detailed Planning (PDF/820KB)
- - -
The Project on Rehabilitation and Recovery from Nepal Earthquake TCDP B - - - ·Monitoring Result (PDF/356KB)
The Project on Urban Transport Improvement for Kathmandu Valley TCDP B - - - -
Kathmandu Valley Water Supply Improvement Project L B - - - -
Nagdhunga Tunnel Construction Project L B - - - -
Preparatory Survey for the Improvement of Tribhuvan International Airport Project L B - - - -
Preparatory Survey on Intersection Improvement Project in Kathmandu L B - - - -
Feasibility Study on the Project for Rehabilitation of Irrigation Facilities in East Terai area GA B - - - -
Pohkara Water Supply Improvement Project GA B ·Preparatory Survey(PDF/7.34MB)
·Appendix 1(PDF/6.15MB)
·Appendix 2(PDF/8.71MB)
·N/A
·Environmental Review (In Japanese)(PDF/294.7KB)
-
The Project for Building Trauma and Emergency Medical Centre at Dulhikhel Hospital GA B - - - -
The Project for Improvement of Aviation Safety Facilities in Major Airports GA B ·Preparatory survey report on the project for improvement of aviation safety facilities in major airports in the federal democratic Republic of Nepal
·N/A
- -
The Project for Improvement of Water Supply in Biratnagar GA B - - - -
The Project for Micro-Hydropower Improvement in Western Area GA B - - ·Apr-14 (Japanese) (PDF)
-
The Project for the Sindhuli Road Earthquake Rehabilitation GA B - - - -
Verification Survey for Disseminating Japanese Technologies for Establishment of Dissemination Model of High-Quality Mitsumata (Argeli) Production for Forest User Groups SSM-VS B - ·N/A
·N/A
·N/A
Feasibility Survey for Mitsumata Production in Nepal SSM-FS B ·final report in japanese
·N/A
·N/A
·N/A
Education Sector Emergency Reconstruction Project L FI - - - -
Housing Emergency Recovery Project L FI - - - -
Preparatory Survey on Transmission and Distribution System Improvement Project in Urban Areas L FI - - - -
The Program for Rehabilitation and Recovery from Nepal Earthquake GA FI - - - -

Pakistan

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Thar Coal Fired Thermal Power Plant Construction Project L A - - - -
Transmission System Network Reinforcement Project in Islamabad and Burhan(New In/out Line to Islamabad University Substation) L A - - - -
The Project for Upgrading of National Disaster Management Plan(NDMP) 2012-2022、“National Disaster Management Plan Ⅱ (NDMPⅡ)2023-2032” TCP B - - - -
Project for Integrated Solid Waste Management Master Plan in Gujranwala TCDP B ·R/D(Feb.20,2013) (PDF/878KB)
·(in Japanese) Environmental and Social Considerations in Detailed Planning Survey (PDF/317KB)
·GE JR15150 ISWM_Supporting 07(Nov,2015) (PDF/3.04MB)
- - -
The Project for Water Supply, Swerage and Drainage Master Plan of Faisalabad TCDP B ·R/D (PDF/1.73MB)
·Environmental and Social Considerations in Detailed Planning Stage (PDF/678KB)
- - -
The Project for the Study of Upgrading National Power System Expansion Plan TCDP B ·Environmental and Social Considerations in Detailed Planning Survey (Word/1,021KB)
·Minutes of Meeting (PDF/728KB)
- - -
Energy Sector Reform Program L B - - - -
Energy Sector Reform Progtam (II) L B - - - -
Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project L B ·N/A
- - -
Transmission System Network Reinforcement Project in Islamabad and Burhan (Tarbela-Burhan-Islamabad Peshawar Road Substation) L B - - - -
The Project for Improvement of Water Treatment Plant and Water Distribution System in Faisalabad GA B - - - -
Flood Damaged Road Rehabilitation Project L FI - - - -

Sri Lanka

Project Name Scheme Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Container Terminals for Colombo South Harbor Development Project L A - - - -
Moragahakanda Development Project L A ·EPC (Oct. 1, 2010) (PDF/935KB)
·EIA (Oct. 1, 2010) (PDF/80.1MB)
·RAP (Oct. 1, 2010) (PDF/36.5MB)
·TBA
-
New Bridge Construction Project over the Kelani River L A ·-Preparatory Survey Volume 1:Cover~5(10.6MB)
·-Volume 1: 5~14(9.51MB)
·-Volume 1: Appendix ; 1~4(10.0MB)
·-Volume 1: Appendix ; 4~9(15.9MB)
·-Volume 2: Cover~Plan(8.84MB)
·-Volume 2: Profile~Substructure General Drawing(14.6MB)
·-Volume 3: Cover~Vol.I(8.42MB)
·-Volume 3: Vol.II(9.67MB)
·-Volume 3: Vol.II(6.51MB)
·-Volume 4: Cover~Appendix2(13.9MB)
·-Volume 4: Appendix ; 2~3(9.39MB)
·-Volume 4: Appendix 4~5(9.40MB)
·-Volume 4: Appendix 5(8.98MB)
·-Volume 4: Appendix 5(9.12MB)
·-Volume 4: Appendix ; 5~10.2(11.8MB)
·EIA (Nov. 1, 2013) (PDF/29.2MB)
·RAP(PDF/7.64MB) (PDF/7.64MB)
·Ex-Ante Evaluation (PDF/43.44KB)
·N/A
Project for Establishment of New Light Rail Transit System in Colombo L A ·Preparatory survey on the project for establishment of new light rail transit system in Colombo final reprot (May. 31, 2018)
·RAPJuly. 24, 2018 (PDF/5.84MB)
·EPCJuly. 25, 2018 (PDF/8.04MB)
·EIAJuly. 25, 2018 (PDF/54.1MB)
·EIA(ADDENDUM) July. 25, 2018 (PDF/6.81MB)
·Environmental Review (PDF/144KB)
·Latest Monitoring Report (December 2019) (PDF/236KB)
Traffic Improvement Project around New Kelani Bridge L A - - - -
BOP business on water supply in non-supply areas TCP B - - - -
Project for Formulation of Western Province Solid Waste Management Master Plan TCP B ·Detailed Planning Survey(April,19 2019) (PDF/963KB)
- ·N/A
·N/A
Project for Formulation of Western Province Solid Waste Management Master Plan TCP B - - - -
Project for Flood Mitigation Master Plan for Colombo Metropolitan Region TCDP B - - - -
Project on Generation and Transmission Master Plan Study TCDP B ·ESC in Detailed Planning Survey (PDF/865KB)
- - -
The Project for Formulating Cascade System Development Plan under North Central Province Canal TCDP B - - - -
The Project for The Strategic Master Plan Under Sewerage Sector TCDP B ·Environmental and Social Considerations in Detailed Planning Survey(May.15,2015) (PDF/860KB)
·RD Sewerage MP(Aug.31,2015) (PDF/939KB)
- - -
Urban Transport System Development Project for Colombo Metropolitan Region and Suburbs TCDP B ·Urban Transport System Development Project for Colombo Metropolitan Region and Suburbs-Final Report
- - -
Anuradhapura North Water Supply Project (Phase1) L B ·Preparatory Survey Volume 1(PDF/2.76MB)
·Volume 2(PDF/7.51MB)
·Volume 3(PDF/8.22MB)
·Volume 4: Cover~Drawings(PDF/10.5MB)
·Volume 4: Drawings(PDF/13.5MB)
·N/A
·Environmental Review
·EIA/RAP (PDF/130KB)
Anuradhapura North Water Supply Project Phase 2 L B ·Preparatory Survey Volume 1 (summary) (PDF/2.49MB)
·Volume 2 (main, cover - chapter 4) (PDF/4.10MB)
·Volume 2 (main, chapter 5 - chapter 10) (PDF/3.56MB)
·Volume 3 (appendix, cover - chapter 5) (PDF/4.44MB)
·Volume 3 (appendix, chapter 6 - chapter 7) (PDF/1.67MB)
·Supplemental Study (PDF/10.1MB)
·N/A
·Environmental Review
-
Bandaranaike International Airport Development Project 2 (II) L B - ·N/A
·Environmental Review
-
Bandaranaike International Airport Development Project Phase2 L B - ·N/A
·Environmental Review
·N/A
Feasibility Study for Cascade System Development Project in North Central Province L B - - - -
Greater Colombo Transmission and Distribution Loss Reduction Project L B ·N/A
·N/A
·Environmental Review
·EIA (PDF/2.00MB)
Greater Colombo Transmission and Distribution Loss Reduction Project Phase2 L B - - - -
Habarana-Veyangoda Transmission Line Construction Project L B ·N/A
·N/A
·Environmental Review
·Result of Monitoring (PDF/1.65MB)
Health and Medical Service Improvement Project L B ·Preparatory Survey(PDF/3.38MB)
·N/A
·Environmental Review (PDF/193KB)
-
Landslide Disaster Protection Project of the National Road Network L B ·N/A
·N/A
·Ex-Ante Evaluation
·Environment Monitoring (December 2019) (PDF/1.08MB)
Landslide Disaster Protection Project of the National Road Network Phase 2 L B ·Preparatory Survey: Cover~Chapter10(PDF/9.77MB)
·Appendix1~Appendix4(PDF/6.95MB)
·Appendix4(PDF/10.86MB)
·Appendix4 site37~Appendix6(PDF/9.07MB)
- - -
Major Bridges Construction Project of the National Road Network L B ·N/A
·N/A
·Ex-Ante Evaluation (PDF/244.66KB)
·-
National Transmission and Distribution Network Development and Efficiency Improvement Project L B - ·N/A
·Environmental Review
-
National Transmission and Distribution Network Development and Efficiency Improvement Project (II) L B ·Preparatory Survey: Cover~Chapter 16(PDF/6.10MB)
·Annex 3.6~Annex 10.5-1(PDF/9.60MB)
·Annex 11.2-1~Annex 12.2-3(PDF/7.34MB)
- - -
Preparatory survey for New Integrated Urban Public Transport System Introduction Project L B ·Preparatory survey 1/13(PDF/2.12MB)
·2/13(PDF/9.03MB)
·3/13(PDF/8.12MB)
·4/13(PDF/7.01MB)
·5/13(PDF/6.98MB)
·6/13(PDF/4.99MB)
·7/13(PDF/5.84MB)
·8/13(PDF/8.40MB)
·9/13(PDF/6.12MB)
·10/13(PDF/9.10MB)
·11/13(PDF/5.66MB)
·12/13(PDF/4.89MB)
·13/13(PDF/6.80MB)
- - -
Project for Development of East Container Terminal in Colombo Port L B - - - -
Rural Infrastructure Development Project (Northern Province, Eastern Province, North Central Province and Uva Province) L B ·N/A
·N/A
·Environmental Review(PDF/308KB)
-
Sri Jayawardenepura Kotte Sewerage Construction Project L B ·Preparatory survey: main report(PDF/8.03MB)
·additional study(PDF/4.24MB)
·
- -
Water Sector Development Project III L B ·The Preparatory Survey on Water Sector Development Project Ⅲ in the Democratic Socialist Republic of Srilanka Final Report Volume1 Executive Summary (June 19, 2015) (PDF/5.91MB)
- - -
The Project for Rehabilitation of Killinochchi Water Supply Scheme GA B ·Preparatory Survey Volume 1(PDF/2.84MB)
·Volume 2(PDF/2.93MB)
·Appendix 1(PDF/3.91MB)
·Appendix 2(PDF/3.31MB)
·Appendix 3(PDF/2.93MB)
·N/A
·Environmental Review (In Japanese)(PDF/219.8KB)
-
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Municipal Solid Waste Material Recovery Facility SSM-VS B ·Final Report (In Japanese)
·N/A
·Environmental Review (In Japanese) (PDF/169KB)
·Final Report (In Japanese)
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Pre-stressed Concrete Tanks for Water Supply and Sewage Treatment Systems in Sri Lanka SSM-VS B - - ·Environmental Review(Japanese) (PDF/142KB)
-
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Recycling Project of Organic Garbage and Agricultural Waste by Screw Type Composting Plant SSM-VS B ·Final Report (In Japanese)
·Environmental Recommendation (Apr.6,2016) (PDF/192KB)
·Environmental Review(Japanese) (PDF/183KB)
·Final Report (In Japanese)
Verification Survey with the Private Sector for Disseminating Japanese Technologies for Wastewater Treatment by Ozone Oxidation Method with Swirling Jet SSM-VS B ·Final Report (In Japanese) (PDF/6.33MB)
·N/A
·Environmental Review(Japanese) (PDF/131KB)
·Final Report (In Japanese) (PDF/6.33MB)
Feasibility Survey for Environmental Protective Slope Protection Technology Using GEOFIBER Method (Continuous Fiber Reinforced Soil Method) SSM-FS B ·Final Report (in Japanese)(PDF/5.46MB)
·N/A
·N/A
·N/A
Feasibility Survey for Incineration Treatment of Medical Wastes in Sri Lanka SSM-FS B ·Final Report (in Japanese)(PDF/6.53MB)
·N/A
·N/A
·N/A
Feasibility Survey for Introducing Self-treatment Type Flush Bio-toilet by Utilizing Oyster Shell SSM-FS B ·final report in japanese
·N/A
·N/A
·N/A
Feasibility Survey for manufacturing and development engineer personnel training program in the industrial education sector. SSM-FS B ·final report in japanese
·N/A
·N/A
·N/A
Emergency Natural Disaster Rehabilitation Project L FI ·N/A
- ·Environmental Review (PDF/100KB)
·Ex-post Evaluation Report(PDF/607KB)

PAGE TOP

Copyright © Japan International Cooperation Agency