Projects classified as Category A, B, or FI

South Asia

  • (TCP) Technical Cooperation Project
  • (TCDP) Technical Cooperation for Development Planning
  • (L) ODA Loans / Private Sector Investment Finance
  • (GA) Grant Aid
  • (SDGs-SS) SDGs Business Supporting Surveys
  • (O) Others
  • EIA: Environmental Impact Assessment
  • EPC: Environmental Permit Certificate
  • RAP: Resettlement Action Plan
  • IPP: Indigenous Peoples Plan

Please click on “Project Name” to view Past Results of Monitoring.

Country Project Name Scheme Applied Guideline Category Report EIA, EPC, RAP, IPP Result of Review Latest Result of Monitoring
Afghanistan The Project for Capacity Development and Institutional Strengthening of Ministry of Agriculture, Irrigation and Livestock(MAIL) TCP 2010 B - - - -
Afghanistan The Project for Development of Water Supply Facilities in Dehsabz South Area GA 2010 B ·Outline Desing Report Volume1
·Volume2
- ·Environmental Review (In Japanese)(PDF/220.8KB) -
Afghanistan The Project for Improvement of existing Bamyan Airport GA 2010 B ·Preparatory survey report on the project for improvement of Bamyan Airport in the Islamic Republic of Afghanistan - - ·Monitoring Result (Apr 2018) (PDF/2.19MB)
Afghanistan The Project for Rehabilitation and Expansion of Aircraft Parking Aprons at Kabul International Airport GA 2010 B ·Preparatory survey on the project for rehabilitation and expansion of aircfraft parking aprons at Kabul International Airport in the Islamic Republic of Afghanistan - - ·Monitoring Result (Apr 2018) (PDF/1.68MB)
Afghanistan The Project for Rehabilitation and Expansion of Aircraft Parking Aprons at Kabul International Airport (Phase2) GA 2010 B ·Preparatory survey report on the project for rehabilitation and expansion of aircraft parking aprons at Kabul international airport (phase 2) in Islamic Republic of Afghanistan - - ·Monitoring Report (Apr 2018) (PDF/1.68MB)
Afghanistan The Project for Rehabilitation of Community Infrastructure in Nangarhar GA 2010 B - - - -
Afghanistan The Project for Rehabilitation of Small Irrigation Facilities and Village Accessibility in Dehsabz Area, Kabul Province GA 2010 B - - - -
Afghanistan The Project for Strengthening Security in Kabul International Airport GA 2010 B ·Preparatory survey report on the project for strengthening security at Kabul international airport in the Islamic Republic of Agfhanistan - - -
Bangladesh Project for the Construction of Dual Gauge Double Line Between Joydebpur-Ishurdi Section L 2010 A - ·EIA(Jan.16,2024) (PDF/112.2MB) - -
Bangladesh Upazila Governance and Development Project (Phase 2) L 2022 FI - - - -
Bangladesh Project for the Formulation of MIDI Master Plan TCDP 2010 A ·Environmental and Social Considerations in Detailed Planning Survey (PDF/888KB) - - -
Bangladesh Araihazar Economic Zone Development Project (Tentative) L 2010 A - ·EIA(June 13, 2018)
·RAP(June 18, 2018)
- -
Bangladesh Chattogram-Cox's Bazar Highway Improvement Project L 2010 A ·Draft Final Report(Dec. 22, 2022) (PDF/27.5MB) ·EIA(Nov. 10, 2022) (PDF/29.8MB)
·EIAECC(Nov. 10, 2022) (PDF/2.85MB)
·RAP(Dec. 22, 2022) (PDF/4.56MB)
·RAP (ANNEX I) (Dec. 22, 2022) (PDF/18.6MB)
·RAP(Supplementary Report) (Dec. 22, 2022) (PDF/8.18MB)
- -
Bangladesh Dhaka Mass Rapid Transit Development Project L 2010 A ·Report (Dec. 5, 2011) (PDF/1.09MB) ·EIA (July 28, 2011) (PDF/3.84MB)
·EPC (July 28, 2011) (PDF/2.70MB)
·RAP (July 28, 2011) (PDF/6.87MB)
·EIA (Supplementary EIA Report for Motijheel to Kamalapur Extension) (Aug. 11, 2021) (PDF/5.37MB)
·EPC (ECC) (Aug. 11, 2021) (PDF/3.21MB)
·RAP (RAP-III for MRT Line 6 from Motijheel to Kamalapur) (Aug. 11, 2021) (PDF/3.70MB)
·Environmental Review (PDF/71.5KB) -
Bangladesh Dhaka Mass Rapid Transit Development Project (Line 1) L 2010 A ·Draft Final Report of Preparatory Study (Nov. 21, 2018) (PDF/62.2MB) ·EIA (Nov. 21, 2018) (PDF/28.3MB)
·ECC (Nov. 21, 2018) (PDF/1.09MB)
·RAP (Nov. 21, 2018) (PDF/4.21MB)
·Environmental Review (PDF/226KB) -
Bangladesh Dhaka Mass Rapid Transit Development Project (Line 5 Northern Route) L 2010 A ·Draft Final Report of Preparatory Survey (Dec. 6, 2017) (PDF/27.9MB) ·RAP(Dec. 6, 2017) (PDF/6.95MB)
·EIAMain Report (Dec. 6, 2017) (PDF/12.0MB)
·EIAAnnex (Dec. 6, 2017) (PDF/14.0MB)
·ECC (Dec. 6, 2017) (PDF/640KB)
- -
Bangladesh Jamuna Railway Bridge Construction Project L 2010 A - ·ECC (Dec. 6, 2017) (PDF/1.17MB)
·EIA(Dec. 6, 2017) (PDF/13.8MB)
·Environmental Review (PDF/142KB) -
Bangladesh Matarbari Port Development Project L 2010 A ·Preparatory Survey Volume 1 (Dec. 21, 2018) (PDF/17.3MB)
·Volume 2 (Dec. 21, 2018) (PDF/22.9MB)
·Volume 3 (Dec. 21, 2018) (PDF/10.5MB)
·Volume 4 (Dec. 21, 2018) (PDF/22.5MB)
·Volume 5 (Dec. 21, 2018) (PDF/18.3MB)
·Volume 6 (Dec. 21, 2018) (PDF/25.5MB)
·EIA Main report (Port) (Dec. 26, 2018) (PDF/16.8MB)
·EIA Appendix (Port) (Dec. 26, 2018) (PDF/15.9MB)
·EIA Main report (Road) (Dec. 26, 2018) (PDF/23.9MB)
·EIA Appendix (Road) (Dec. 26, 2018) (PDF/14.5MB)
·EPC (Port) (Dec. 26, 2018) (PDF/1.88MB)
·EPC (Road) (Dec. 26, 2018) (PDF/2.89MB)
·RAP Main report (Port) (Dec. 26, 2018) (PDF/4.52MB)
·RAP Appendix (Port) (Dec. 26, 2018) (PDF/1.02MB)
·RAP Main report (Road) (Dec. 26, 2018) (PDF/6.16MB)
·RAP Appendix (Road) (Dec. 26, 2018) (PDF/1.49MB)
·Environmental Review(PDF/211KB) -
Bangladesh Matarbari Ultra Super Critical Coal-Fired Power Project L 2010 A ·Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh Final Report on Power Plant / Port / Transmission Line / Access Road / Execution Survey of Natural Condition(Mar. 31, 2015) Book 1 (PDF/16,372KB)
·Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh Final Report on Power Plant / Port / Transmission Line / Access Road / Execution Survey of Natural Condition(Mar. 31, 2015) Book 2 (PDF/6,814KB)
·Preparatory Survey on Chittagong Area Coal Fired Power Plant Development Project in Bangladesh Final Report on Power Plant / Port / Transmission Line / Access Road / Execution Survey of Natural Condition(Mar. 31, 2015) Book 3 (PDF/35,139KB)
·EC Access Road (Nov. 19, 2013) (PDF/224KB)
·EC Access Road (Package 3.3) (Apr. 27, 2020) (PDF/151KB)
·EC Transmission Lines (Nov. 19, 2013) (PDF/130KB)
·EIA Access Road (Nov. 19, 2013) (PDF/9.23MB)
·EIA Access Road (Package 3.3) (Apr. 27, 2020) (PDF/8.80MB)
·EIA Transmission Lines (Nov. 19, 2013) (PDF/5.19MB)
·RAPAccess Road (Mar. 8, 2018) (PDF/4.75MB)
·EIA (Oct. 28, 2013) (PDF/12.2MB)
·EIA Approval (Oct. 28, 2013) (PDF/679KB)
·RAP (Sep. 14, 2020) (PDF/3.33MB)
·RAP (Oct. 28, 2013) (PDF/951KB)
·EIARural Electrification (MAr. 8, 2021) (PDF/12.1MB)
·EIATransmission Line (Mar. 8, 2021) (PDF/18.1MB)
·Environmental Review (PDF/185KB) -
Bangladesh Preparatory Survey on Ocean Front Economic Zone Development Project in Bangabandhu Sheikh Mujib Shilpa Nagar L 2010 A - - - -
Bangladesh Sirajganj Combined Cycle Power Plant Project L 2010 A - ·EIA(Nov.22,2016) (PDF/16.6MB)
· (PDF/103MB)
·EIA Approval (PDF/610KB)
- -
Bangladesh Southern Chattogram Region Water Supply Project L 2022 A - - - -
Bangladesh The Kanchpur, Meghna, and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation Project (I) L 2010 A ·Preparatory survey for Dhaka-Chittagong national highway No.1 bridge construction and rehabilitation project (project name : the Kanchpur, Meghna, Gumti 2nd bridges construction and existing bridges rehabilitation project) : final report (Feb. 27, 2017) (Vol.1)
·Preparatory survey for Dhaka-Chittagong national highway No.1 bridge construction and rehabilitation project (project name : the Kanchpur, Meghna, Gumti 2nd bridges construction and existing bridges rehabilitation project) : final report (Feb. 27, 2017) (Vol.2)
·Preparatory survey for Dhaka-Chittagong national highway No.1 bridge construction and rehabilitation project (project name : the Kanchpur, Meghna, Gumti 2nd bridges construction and existing bridges rehabilitation project) : final report (Feb. 27, 2017) (Vol.2)
·EIA (Nov. 16, 2012) (PDF/3.28MB)
·ECC (Nov. 16, 2012) (PDF/588KB)
·RAP (Nov. 16, 2012) (PDF/8.35MB)
·Environmental Review (PDF/197KB) -
Bangladesh SDGs Business Model Formulation Survey with the Private Sector for Establishment of Efficient and Hygienic Waste Storage System SDGs-SS 2010 B - - - -
Bangladesh SDGs Business Model Formulation Survey with the Private Sector for Introduction of Water Recycling Technology for Textile Dyeing Industry SDGs-SS 2010 B - - - -
Bangladesh Capacity Development Project for Participatory Water Resource Management through Integrated Rural Development TCP 2010 B - - - -
Bangladesh Capacity Development Project for Participatory Water Resources Management through Integrated Rural Development TCP 2010 B - - - ·Environmental Monitoring Report (PDF/134KB)
Bangladesh The Project for Building Disaster Resilience Organization on Comprehensive River Maintenance with Development of Sustainable Riverbank Protection and Institution Technology TCP 2010 B - - - -
Bangladesh Project for Development Study and Capacity Enhancement of Bangladesh Economic Zone Development Plan Authority TCDP 2010 B - - - -
Bangladesh Project for Development of Policy and Guidelines for Transit Oriented Development along Mass Transit Corridors TCDP 2010 B - - - -
Bangladesh The Integrated Energy and Power Master Plan Project TCDP 2010 B ·Environmental Social Considerations in Detailed Planning Survey (PDF/1.12MB) - - -
Bangladesh The Project for Capacity Development of Management for Sustainable Water Related Infrastructure TCDP 2010 B - - - -
Bangladesh The Project for Developing Inclusive City Government for City Corporations TCDP 2010 B - - - -
Bangladesh Bangladesh FSRU Project L 2010 B - - - -
Bangladesh Cross-Border Road Network Improvement Project(Bangladesh) L 2010 B - - ·Environmental Review -
Bangladesh Dhaka Underground Substation Construction Project L 2010 B - - ·Environmental Review(PDF/143KB) -
Bangladesh Dhaka-Chittagong Main Power Grid Strengthening Project L 2010 B - - ·Environmental Review(PDF/205KB) -
Bangladesh Haor Flood Management and Livelihood Improvement Project L 2010 B ·Preparatory survey on upper Meghna river basin watershed management improvement project in the People's Republic of Bangladesh : final report (Vol.1)
·(Vol.2)
- ·Environmental Review (PDF/68KB) -
Bangladesh Hazrat Shahjalal International Airport Expansion Project L 2010 B - ·EIA(Jun. 23, 2020) (PDF/14.3MB)
·EPC(Jun. 23, 2020) (PDF/239KB)
·Environmental Review (PDF/315KB) -
Bangladesh Inclusive City Governance Project L 2010 B - - ·Environmental Review (PDF/70KB) -
Bangladesh Karnaphuli Water Supply Project (Phase2) L 2010 B - - ·Environmental Review (PDF/70KB) -
Bangladesh Mirsharai Steel Plant Construction Project L 2010 B - - - -
Bangladesh National Power Transmission Development Project L 2010 B - - ·Environmetal Review(PDF/76KB) -
Bangladesh Natural Gas Efficiency Project L 2010 B ·Preparatory Survey (PDF/5.95KB) - ·Environmental Review (PDF/73KB) -
Bangladesh Pabna Solar Power Project L 2022 B - - - -
Bangladesh Preparatory Survey for the Construction and Operation of Imported Coal Transshipment Terminal Project in Matarbari Area L 2010 B - - - -
Bangladesh Southern Chattogram Regional Development Project L 2010 B - - - -
Bangladesh Urban Development and City Development Project L 2010 B - - - -
Bangladesh Western Bangladesh Bridges Improvement Project L 2010 B - - ·Environmental Review (PDF/105KB) -
Bangladesh Poverty Reduction Efforts GA 2010 B - - - -
Bangladesh Project for Improvement of Bangladesh Fisheries Development Corporation Fish Landing Center, Cox’s Bazar GA 2010 B ·PREPARATORY SURVEY ON THE PROJECT FOR IMPROVEMENT OF BANGLADESH FISHERIES DEVELOPMENT CORPORATION FISH LANDING CENTER, COX’S BAZAR IN BANGLADESH (PDF/14.9MB) - - -
Bangladesh The Fourth Primary Education Development Program GA 2010 B - - - -
Bangladesh The Third Primary Education Development Programme GA 2010 B - - - -
Bangladesh Project for Waste Reduction and 3R Promotion Support for Building a Sustainable Society TCP 2010 B - - - -
Bangladesh The Project for Capacity Building on Sustainable Bridge Maintenance and Management in Bangladesh TCP 2022 B - - - -
Bangladesh Disaster Risk Management Enhancement Project L 2010 FI ·The Praparatory Survey on the Capacity Enhancement on Disaster Risk Reduction, Emergency Response and Recovery Project in the People's Republic of Bangladesh Final Report (Vol. 1)
·(Vol. 2)
·(Vol.3-1)
·(Vol.3-2)
- ·Environmental Review (PDF/114KB) -
Bangladesh Energy Efficiency and Conservation Promotion Financing Project L 2010 FI ·Preparatory Survey(PDF/3.36MB) - ·Environmental Review (PDF/136KB) -
Bangladesh Energy Efficiency and Conservation Promotion Financing Project (Phase 2) L 2010 FI - - ·Environmental Review (PDF/202KB) -
Bangladesh Food value chain improvement project L 2010 FI - - - -
Bangladesh Foreign Direct Investment Promotion Project L 2010 FI - ·EIA(June13, 2018) (PDF/17.3MB)
·RAP(June 18, 2018) (PDF/2.37MB)
·Result of Envionmental and Social consideration review (PDF/251KB) -
Bangladesh Green Finance Promotion Project L 2010 FI - - - -
Bangladesh Health and Population Sector Development Program (1) L 2010 FI - - ·Environmental Review (PDF/96KB) -
Bangladesh Maternal, Neonatal and Child Health (MNCH) and Health System Improvement Project L 2010 FI ·The preparatory survey on maternal, neonatal, and child health improvement project : health, population and nutrition sector development program : phase 2 : in the People's Republic of Bangladesh : final report - ·Environmental Review (PDF/205KB) -
Bangladesh Northern Bangladesh Integrated Development Project L 2010 FI - - ·Environmental Review (PDF/77KB) -
Bangladesh Renewable Energy Development Project L 2010 FI ·Preparatory Survey (PDF/4.21MB) - ·Environmental Review (PDF/68KB) -
Bangladesh Small Scale Water Resources Development Project (Phase 2) L 2010 FI - - ·Environmental Review (PDF/146KB) -
Bangladesh Upazila Governance and Development Project L 2010 FI ·The Study of the Upazila Governance and Development Project in the People’s Republic of Bangladesh - ·Environmental Review (PDF/219KB) -
Bangladesh Urban Building Safety Project L 2010 FI - - ·Environmental Review (PDF/182KB) -
Bangladesh The Capacity Development Project in Relation to Ship Recycling Yard and TSDF Development TCP 2022 B - - - -
Bhutan Project for the Formulation of Southern Central Regional Plan TCDP 2010 B ·Signed - RD for Southern Central Regional Plan(PDF/5.64MB)
·Environmental and Social Considerations in Detailed Planning Survey(PDF/208KB)
- - -
Bhutan The Project for Reconstruction of Bridges on Primary National Highway No. 1 in Mongar District GA 2010 B - - - -
Bhutan the Project on Power System Master Plan 2040 TCDP 2010 A ·ESC in Detailed Planning Survey (PDF/1.09MB)
·RD (PDF/878KB)
- - -
Bhutan Hydro Power Plant Development Project L 2022 A - - - -
Bhutan Feasibility Survey for road-side slope disaster countermeasure technologies and methods. SDGs-SS 2010 B ·final report in japanese - - -
Bhutan Verification Survey with the Private Sector for Disseminating Japanese Technologies for The small sewerage by energy-saving wastewater treatment technology named Dojo-Joka System SDGs-SS 2010 B ·Final Report (In Japanese) - ·Environmental Review (In Japanese) (PDF/230KB) ·Final Report (In Japanese)
Bhutan Project for Master Plan / Baseline Study of Mining and Mineral Deposits in Bhutan TCP 2010 B - - - -
Bhutan Project for Formulation of Comprehensive Development Plan for Bhutan 2030 TCDP 2010 B ·RD (PDF/1.25MB)
·ESC in detailed planning survey (PDF/446KB)
- - -
Bhutan Project for Master Plan Study on Road Slope Management in Bhutan TCDP 2010 B - - - -
Bhutan The Project for Reconstruction of Bridges on Primary National Highway No. 4 GA 2010 B ·Report in Japanese(Nov. 1, 2016)(PDF/10.3MB) - - -
Bhutan The Project for Reconstruction of Bridges on Primary National Highway No.1 GA 2010 B ·Report (Apr. 1, 2015)(PDF/10.9MB) - - -
Bhutan The Project for the Rehabilitation of Taklai Irrigation System in Sarpang District GA 2010 B - - - ·Environmental Monitoring (PDF/539KB)
India The Project for Promoting Sustainable Horticulture in Haryana (I) L 2022 FI - - - -
India Mumbai Metro Line 11 Project L 2022 A - - - -
India Project for Construction of Mumbai-Ahmedabad High Speed Rail L 2010 A ·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 1 (PDF/5.17MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 2 (PDF/12.9MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 3 (PDF/20.5MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 4 (PDF/26.8MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 5 (PDF/28.7MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 6 (PDF/7.20MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 7 (PDF/14.7MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 8 (PDF/23.7MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 9 (PDF/16.2MB)
·Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor 10 (PDF/9.43MB)
·RAP(December 23,2021) (PDF/9.05MB)
·EPC(December 23, 2021) (PDF/422KB)
·EIAVol. 1 (September 14, 2018) (PDF/11.8MB)
·EIAVol. 2 (September 14, 2018) (PDF/17.4MB)
·RAP(September 14, 2018) (PDF/4.80MB)
·IPP(September 14, 2018) (PDF/4.75MB)
·(September 14, 2018) (PDF/58.9KB)
·Environmental Review (In Japanese) (PDF/313KB) ·RAP External Monitoring (June, 2023) (PDF/11.2MB)
India Project for the National Centre for Medical Device Development, Validation and Skill Training in All India Institute of Medical Sciences Delhi L 2022 B - - - -
India Ahmedabad Metro Rail Project L 2010 A - ·EIA (Nov. 25, 2014) (PDF/16.5MB)
·SIA (Nov. 25, 2014) (PDF/17.1MB)
·EPC (Nov. 25, 2014) (PDF/37KB)
·Environmental Review (PDF/170KB) -
India Bengaluru Metro Project (Phase2) L 2010 A - ·EPC(November. 10, 2020) (PDF/299KB)
·EIA2A (November. 10, 2020) (PDF/19.6MB)
·RAP2A (November. 10, 2020) (PDF/6.89MB)
·EIA2B (November. 10, 2020) (PDF/19.0MB)
·RAP2B (November. 10, 2020) (PDF/5.32MB)
·EIAR6 (November. 10, 2020) (PDF/5.13MB)
·EIAR6 Addendum (November. 10, 2020) (PDF/1.09MB)
·RAPR6 (November. 10, 2020) (PDF/4.77MB)
·RAPAll Addendum (November. 10, 2020) (PDF/516KB)
- -
India Bengaluru Peripheral Ring Road L 2010 A - ·EIA (Nov. 20, 2014) (PDF/15.7MB)
·RAP(Nov. 5, 2015) (PDF/4.87MB)
- -
India Chennai Metro Project Phase 2 L 2010 A - ·EIA (Nov.21, 2017) (PDF/2.19MB)
·RAP(Nov. 21, 2017) (PDF/10.9MB)
·EPC (Nov.21, 2017) (PDF/46.4KB)
- -
India Chennai Peripheral Ring Road Project L 2010 A ·Preparatory Survey (in Japanese) (Aug. 28, 2018) (PDF/17.3MB) ·EIA(Aug. 28, 2018) (PDF/21.7MB)
·RAP(Aug. 28, 2018) (PDF/77.9MB)
·EPC(Aug. 28, 2018) (PDF/52.0MB)
- ·Result of Monitoring (2023Q1) (PDF/12.4MB)
India Delhi Mass Rapid Transport System Project Phase 3 L 2010 A - ·EIA(Aug. 23, 2012) (PDF/21.0MB)
·EPC(Aug. 23, 2012) (PDF/29KB)
·RAP (Aug. 23, 2012) (PDF/2.46MB)
·EIA (Mar. 31, 2018) (PDF/2.25MB)
· SIA (Mar. 31, 2018) (PDF/2.02MB)
·Environmental Review (PDF/88KB) ·Monitoring Results (2Q FY 2022) (PDF/327KB)
India Delhi Mass Rapid Transport System Project Phase 4 L 2010 A - ·Addendum of EIA (Aug 2020) (PDF/2.08MB)
·Addendum of SIA (Aug 2020) (PDF/1.06MB)
·EIA(Jun. 18, 2020) (PDF/5.45MB)
·RAP(Jun. 18, 2020) (PDF/9.49MB)
·EPC(Jun. 18, 2020) (PDF/425KB)
·Monitoring Results (2Q FY2022) (PDF/261KB) ·Result of Monitoring (2023Q1) (PDF/5.9MB)
India Gurgaon- Bawal Mass Rapid Transit System Project L 2010 A - - - -
India Mumbai Metro Line 3 Project L 2010 A - ·RAPSIA(Mar.4,2021) (PDF/7.80MB)
·EIAEIA-Part1(Oct. 23, 2020) (PDF/7.64MB)
·EIAEIA-Part2(Oct. 23, 2020) (PDF/2.56MB)
·RAPSIA(Jan. 4, 2018) (PDF/6.55MB)
·EIAEIA(Sep,2012) (PDF/10.3MB)
·Environmental Review (PDF/183KB) ·RAP Monitoring Result (2QFY2022) (PDF/1.17MB)
India Mumbai Trans Harbour Link Project L 2010 A ·Preparatory Survey_Main 1
·Preparatory Survey_Main 2
·Preparatory Survey_Main 3
·Preparatory Survey_Appendix 1
·Preparatory Survey_Appendix 2
·Preparatory Survey_Appendix 3
·Preparatory Survey_Appendix 4
·EIA(Nov.26, 2015) (PDF/23.0MB)
·EPC(Nov.26, 2015) (PDF/1.84MB)
·RAP(Jan.7, 2016) (PDF/22.9MB)
·Environmental Review (PDF/178KB) ·Result of Monitoring (2023Q1) (PDF/23.5MB)
India New Dholera international airport development project in the Republic of India L 2010 A - - - -
India North East Road Network Connectivity Improvement Project (Phase 5) L 2010 A ·Preparatory Survey Volume 1 (Feb. 16, 2021) (PDF/15.5MB)
·Preparatory Survey Volume 2 (Feb. 16, 2021) (PDF/29.3MB)
·EIA(Aug. 21, 2020) (PDF/13.6MB)
·EPC(Authorization letter)(Aug. 21, 2020) (PDF/361KB)
·RAP(Supplemental Social Assessment Report)(Feb. 10, 2021) (PDF/5.02MB)
- -
India North East Road Network Connectivity Improvement Project (Phase 7) L 2010 A - ·EIA(July 27, 2022) (PDF/14.9MB)
·EPC(July 27, 2022) (PDF/310KB)
·RAP(January 6, 2023) (PDF/2.93MB)
- -
India North East Road Network Connectivity Improvement Project Phase 2 L 2010 A ·(Jul. 7, 2017) NH40 (PDF/24.7MB)
·(Jul. 7, 2017)NH54 BYPASSES (PDF/8.15MB)
·EIA(Jul. 3, 2017) NH40 (PDF/11.5MB)
·EIA(Jul. 3, 2017) NH54 BYPASSES (PDF/8.95MB)
·EPC(Jul. 3, 2017) (PDF/315KB)
·RAP(Jul. 7, 2017) NH40 (PDF/6.40MB)
·RAP(Jul. 7, 2017)NH54 BYPASSES (PDF/1.57MB)
- ·Result of Monitoring (PDF/565KB)
India North East Road Network Connectivity Improvement Project Phase 3 L 2010 A ·Preparatory Survey (June. 12, 2018) (PDF/12.6MB) ·EIA(May. 22, 2018) (PDF/4.56MB)
·RAP(June. 12, 2018) (PDF/1.99MB)
·EPC(May. 22, 2018) (PDF/32.0KB)
- -
India North East Road Network Connectivity Improvement Project Phase 4 L 2010 A - ·EPC(Nov.20.2019) (PDF/130KB)
·EIA(Nov.20.2019) (PDF/4.98MB)
·RAP(Jan.30.2020) (PDF/4.31MB)
- -
India North East Road Network Connectivity Improvement Project Phase 6 L 2010 A ·Preparatory Survey Part 1 (Dec. 2, 2021) (PDF/31.1MB)
·Preparatory Survey Part 2(Dec. 2, 2021) (PDF/14.5MB)
·RAP(Dec.2, 2021) (PDF/8.89MB)
·EPC(July 5, 2021) (PDF/313KB)
·EIA(Dec.1,2020) (PDF/16.1MB)
- -
India North East Road Network Connectivity Improvement Project Phase I L 2010 A ·Preparatory Survey (Oct. 23, 2015) (PDF/19.7MB) ·EIA(Nov. 20, 2015) (PDF/7.09MB)
·EPC(Nov. 20, 2015) (PDF/275KB)
·RAP(Oct. 23, 2015) (PDF/7.94MB)
·Environmental Review (PDF/195KB) ·Result of Monitoring (PDF/565KB)
India Patna Metro Rail Project L 2010 A ·Draft Final Report_Volume 1(December 20, 2022) (PDF/447KB)
·Draft Final Report_Volume 2(December 20, 2022) (PDF/20.6MB)
·Draft Final Report_Volume 3(December 20, 2022) (PDF/16.9MB)
·Draft Final Report_Appendix 1(December 20, 2022) (PDF/23.3MB)
·Draft Final Report_Appendix 2(December 20, 2022) (PDF/31.4MB)
·Draft Final Report_Appendix 3(December 20, 2022) (PDF/21.8MB)
·EIA(October 31, 2022) (PDF/8.04MB)
·EPC(October 31, 2022) (PDF/40.0KB)
·RAP(November 21, 2022) (PDF/7.32MB)
- -
India Project for the Construction of Chennai Peripheral Ring Road (Phase 2) L 2022 A - ·EIA(Nov 21, 2022) (PDF/7.68MB)
·EIA(July 11, 2023) (PDF/4.18MB)
·RAP.SIA(July.11,2023) (PDF/2.15MB)
- -
India Project for the Construction of Turga Pumped Storage L 2010 A ·Preparatory Survey(July. 4, 2018) (PDF/27.0MB) ·EIAEIA 1(July. 4, 2018) (PDF/16.2MB)
·EIAEIA 2(July. 4, 2018) (PDF/2.01MB)
·EIAEIA 3(July. 4, 2018) (PDF/1.79MB)
·EIAEIA 4(July. 4, 2018) (PDF/6.91MB)
·EPCEPC(Environmental Clearance Certificate) (July. 4, 2018) (PDF/1.99MB)
·RAPRAP(Abbreviated Resttlement Action Plan) (July. 4, 2018) (PDF/1.33MB)
- -
India Rengali Irrigation Project LBC-II, Phase II L 2010 A - ·EIA (Nov. 20, 2014) (PDF/30.3MB)
·EPC (Nov. 20, 2014) (PDF/10.2MB)
·RAP (Nov. 20, 2014) (PDF/23.3MB)
·Environmental Review (PDF/115KB) ·Result of Monitoring (2023Q1) (PDF/5.8MB)
India Project for Upgradation of Environmental Management for Ship Recycling in Alang and Sosiya in Gujarat L 2010 A ·Preparatory Survey (July 31, 2017) (PDF/12.6MB) ·EIA(Nov. 16, 2016) (PDF/63.6MB)
·EPC(Nov. 16, 2016) (PDF/1.71MB)
- -
India Tuticorin Port Outer Harbour Development Project L 2010 A - - - -
India Urban Railway Project in Pune City L 2010 A - - - -
India Feasibility Survey for Holistic Management System of Sewage Treatment Plant with Remote Monitoring Technology in India. SDGs-SS 2010 B ·Final Report - - -
India Feasibility Survey for environmentally friendly toilet in India SDGs-SS 2010 B ·final report in Japanese part1
·final report in Japanese part2
- - -
India Comprehensive Traffic and Transportation Study for the Andhra Pradesh Capital Region Development Authority Jurisdiction TCDP 2010 B - - - -
India The Project for Formulation of Comprehensive Flood Control Master Plan in Urbanized River Basins in Chennai TCDP 2010 B - - - -
India The Study on Development and Management of Land and Water Resources for Sustainable Agriculture in Mizoram TCDP 2010 B - - - -
India Andhra Pradesh Irrigation and Livelihood Improvement Project (Phase 2) L 2010 B - - - -
India Assam Health System Strengthening Project L 2010 B - - - -
India Bengaluru Water Supply and Sewerage Project (Phase 3) L 2010 B - - - -
India Chennai Seawater Desalination Plant Project L 2010 B - - - -
India Delhi Water Supply Improvement Project L 2010 B - - ·Environmental Review (PDF/51KB) -
India Guwahati Sewerage Project L 2010 B - - ·Environmental Review (PDF/32KB) -
India Himachal Pradesh Crop Diversification Promotion Project (Phase 2) L 2010 B - - - -
India Imphal Water Supply Improvement Project L 2010 B - - - -
India Madhya Pradesh Rural Water Supply Project L 2010 B - - - -
India Madhya Pradesh Transmission System Modernization Project L 2010 B - - ·Environmental Review (PDF/160KB) -
India Nagaland Medical College Hospital Development Project L 2010 B - - - -
India Nellore Water Supply and Sewerage Project L 2010 B - - - -
India Odisha Transmission System Improvement Project L 2010 B - - ·Environmental Review (PDF/115KB) -
India Preparatory Survey on Next Generation Medical Logistics Centre Project L 2010 B - - - -
India Project for Establishment of Mizoram State Super-Specialty Cancer and Research Centre L 2010 B - - - -
India Project for Pollution Abatement of River Mula-Mutha in Pune L 2010 B ·Preparatory Survey
·Preparatory Survey
- ·Environmental Review (PDF/94KB) -
India Project for Pollution Abatement of River Nag at Nagpur L 2010 B - - - -
India Rajasthan Hybrid Renewable Energy Project L 2010 B - ·EIA(Sep. 14, 2020) (PDF/19.1MB)
·EPC(Sep. 14, 2020) (PDF/20.5KB)
- -
India Rajasthan Rural Water Supply and Fluorosis Mitigation Project (Nagaur) L 2010 B - - ·Environmental Review (PDF/48KB) -
India Rajasthan Rural Water Supply and Fluorosis Mitigation Project (Phase 2) L 2010 B - - - -
India Rajasthan Water Sector Livelihood Improvement Project L 2010 B - - ·Environmental Review (PDF/170KB) -
India Ranchi Sewerage Project L 2010 B - - - -
India Tamil Nadu Transmission System Improvement Project L 2010 B - - ·Environmental Review (PDF/46KB) -
India Tamil Nadu Urban Health Care Project L 2010 B - - ·Environmental Review (PDF/172KB) -
India The Project for the Setting up of All India Institute of Medical Sciences Madurai L 2010 B - - - -
India Transmission System Strengthening Works in Madhya Pradesh L 2010 B - - ·Environmental Review (PDF/160KB) -
India The Project for Countermeasure Construction for the slope failures on National Highway 55 GA 2010 B - - - -
India Capacity Enhancement for Effective Implementation of Forest Policy L 2010 FI - - - -
India Climate Change Management Project L 2010 FI - - - -
India Climate Change Mitigation Project L 2010 FI - - - -
India Himachal Pradesh Forest Ecosystems Management and Livelihoods Improvement Project L 2010 FI - - - -
India Initiative for Horticulture Intensification by Micro Drip Irrigation in Jharkhand L 2010 FI - - ·Environmental Review (PDF/181KB) -
India Micro, Small and Medium Enterprises Energy Saving Project Phase 2 L 2010 FI - - ·Environmental Review (PDF/85KB) -
India Micro, Small and Medium Enterprises Energy Saving Project Phase 3 L 2010 FI - - ·Environmental Review (PDF/44KB) -
India Mizoram Biodiversity Conservation and Forest Enrichment Project L 2022 FI - - - -
India Nagaland Forest Management Project L 2010 FI - - ·Environmental Review (PDF/159KB) -
India New and Renewable Energy Development Project L 2010 FI - - ·Environmental Review (PDF/37KB) -
India New and Renewable Energy Development Project - Phase 2 L 2010 FI - - ·Environmental Review (PDF/43KB) -
India Odisha Forestry Sector Development Project (Phase II) L 2010 FI - - ·Environmental Review (PDF/231KB) -
India PPP Infrastructure Financing Project L 2010 FI - - ·Environmental Review (PDF/138KB) -
India Project for Ecosystem Management in Gujarat L 2010 FI - - - -
India Project for Forest and Biodiversity Conservation for Climate Resilience Enhancement in West Bengal L 2010 FI - - - -
India Project for Sustainable Community Forest Management in Meghalaya L 2010 FI - - - -
India Promotion of small and medium-sized enterprises through impact investment L 2010 FI - - - -
India Rajasthan Afforestation and Biodiversity Conservation Project L 2022 FI - - - -
India Tamil Nadu Biodiversity Conservation and Greening Project phase 2 L 2010 FI - - - -
India Telangana Startup and Innovation Ecosystem Strengthening Project L 2010 FI - - - -
India Tripura Sustainable Forest Management Project L 2010 FI - - - -
India Uttarakhand Forest Resource Management Project L 2010 FI - - ·Environmental Review (PDF/97KB) -
India Uttarakhand Integrated Horticulture Development Project L 2010 FI - - - -
India West Bengal Forest and Biodiversity Conservation Project L 2010 FI ·Preparatory Survey - ·Environmental Review (PDF/49KB) -
India West Bengal Piped Water Supply Project (District of Purulia) L 2010 FI - - ·Environmental Review (PDF/48KB) -
India Uttarakhand Urban Water Supply Project L 2022 FI - - - -
Maldives Feasibility Survey for Solid Waste Disposal System with Thermal Decomposition Furnace SDGs-SS 2010 B ·final report in japanese - - -
Maldives The Project for Building Climate Resilient Safer Islands in the Maldives TCP 2010 B ·DETAILED PLANNING SURVEY REPORT_Ch1-5(Jan, 2023) (PDF/22.4MB)
·DETAILED PLANNING SURVEY REPORT_Ch 6-10(Jan, 2023) (PDF/5.45MB)
- ·Environmental Review (in Japanese)(PDF/0.39MB) -
Maldives Project for the Formulation of Master Plan for Sustainable Fisheries TCDP 2010 B ·R/D (PDF/348KB)
·ESC in Detailed Planning Survey (PDF/665KB)
- - -
Maldives COVID-19 Crisis Response Emergency Support Loan L 2010 B - - - -
Maldives Digital Terrestrial Television Broadcasting Network Development Project GA 2010 B - - - -
Maldives The Project for Disaster Resilience Enhancement in Male' GA 2022 B - - - -
Maldives Building Climate Resilient Safer Islands in the Maldives O 2010 B ·Environmental and Social Management Framework (PDF/2.26MB)
·Stakeholder Engagement Plan (PDF/824KB)
·DETAILED PLANNING SURVEY REPORT_Ch1-5 (Jan, 2023) (PDF/22.4MB)
·DETAILED PLANNING SURVEY REPORT_Ch 6-10 (Jan, 2023) (PDF/5.45MB)
- ·Environmental Review (in Japanese) (PDF/283KB) -
Maldives Tourism Sector Support Project L 2010 FI - - - -
Nepal Project for Capacity Development on Flood Control for Disaster Risk Reduction in Sunsari and Morang Districts TCP 2010 B ·Environmental and Social Considerations(July 28, 2023) (PDF/2.71MB) - - -
Nepal Project for the Improvement of Suryabinayak−Dhulikhel Road L 2010 A ·Preparatory Survey (October. 19, 2018)(PDF/34.8 MB) ·EIA(October. 19, 2018) (PDF/51.2MB)
·EPC(October. 19, 2018) (PDF/444KB)
·RAP(Nov. 20, 2018) (PDF/3.41MB)
- -
Nepal Feasibility Survey for Mitsumata Production in Nepal SDGs-SS 2010 B ·final report in japanese - - -
Nepal Verification Survey for Disseminating Japanese Technologies for Establishment of Dissemination Model of High-Quality Mitsumata (Argeli) Production for Forest User Groups SDGs-SS 2010 B - - - -
Nepal Terai River Basin Flood Risk Management Project TCP 2010 B - - - -
Nepal Project for Development of Master Plan for Wastewater Management in Pokhara Metropolitan City TCDP 2010 B ·Detailed Planning Survey (PDF/1.09MB) - - -
Nepal Project on Integrated Power System Development Plan in Nepal TCDP 2010 B ·Minutes of Meetings (PDF/1.06MB)
·Environmental and Social Considerations Detailed Planning (PDF/820KB)
- - -
Nepal Project on Kathmandu Valley Urban Transport System Master Plan TCDP 2022 B ·Environmental and Social Considerations in Detailed Planning Survey (PDF/1.3MB)
·RD (PDF/9.4MB)
- - -
Nepal The Project on Rehabilitation and Recovery from Nepal Earthquake TCDP 2010 B - - - ·Monitoring Result (PDF/356KB)
Nepal The Project on Urban Transport Improvement for Kathmandu Valley TCDP 2010 B - - - -
Nepal Kathmandu Valley Water Supply Improvement Project L 2010 B - - - -
Nepal Nagdhunga Tunnel Construction Project L 2010 B - - - -
Nepal Preparatory Survey for the Improvement of Tribhuvan International Airport Project L 2010 B - - - -
Nepal Preparatory Survey on Intersection Improvement Project in Kathmandu L 2010 B - - - -
Nepal Feasibility Study on the Project for Rehabilitation of Irrigation Facilities in East Terai area GA 2010 B - - - -
Nepal Pohkara Water Supply Improvement Project GA 2010 B ·Preparatory Survey(PDF/7.34MB)
·Appendix 1(PDF/6.15MB)
·Appendix 2(PDF/8.71MB)
- ·Environmental Review (In Japanese)(PDF/294.7KB) -
Nepal The Project for Building Trauma and Emergency Medical Centre at Dulhikhel Hospital GA 2010 B - - - -
Nepal The Project for Improvement of Aviation Safety Facilities in Major Airports GA 2010 B ·Preparatory survey report on the project for improvement of aviation safety facilities in major airports in the federal democratic Republic of Nepal - - -
Nepal The Project for Improvement of Water Supply in Biratnagar GA 2010 B - - - -
Nepal The Project for Micro-Hydropower Improvement in Western Area GA 2010 B - - ·Apr-14 (Japanese) (PDF) -
Nepal The Project for the Sindhuli Road Earthquake Rehabilitation GA 2010 B - - - -
Nepal Education Sector Emergency Reconstruction Project L 2010 FI - - - -
Nepal Housing Emergency Recovery Project L 2010 FI - - - -
Nepal Impact Investment Promotion Project L 2022 FI - - - -
Nepal Preparatory Survey on Transmission and Distribution System Improvement Project in Urban Areas L 2010 FI - - - -
Nepal The Program for Rehabilitation and Recovery from Nepal Earthquake GA 2010 FI - - - -
Pakistan Thar Coal Fired Thermal Power Plant Construction Project L 2010 A - - - -
Pakistan Transmission System Network Reinforcement Project in Islamabad and Burhan(New In/out Line to Islamabad University Substation) L 2010 A - - - -
Pakistan The Project for Upgrading of National Disaster Management Plan(NDMP) 2012-2022、“National Disaster Management Plan Ⅱ (NDMPⅡ)2023-2032” TCP 2010 B - - - -
Pakistan Project for Integrated Solid Waste Management Master Plan in Gujranwala TCDP 2010 B ·R/D(Feb.20,2013) (PDF/878KB)
·(in Japanese) Environmental and Social Considerations in Detailed Planning Survey (PDF/317KB)
·GE JR15150 ISWM_Supporting 07(Nov,2015) (PDF/3.04MB)
- - -
Pakistan The Project for Water Supply, Swerage and Drainage Master Plan of Faisalabad TCDP 2010 B ·R/D (PDF/1.73MB)
·Environmental and Social Considerations in Detailed Planning Stage (PDF/678KB)
- - -
Pakistan The Project for the Study of Upgrading National Power System Expansion Plan TCDP 2010 B ·Environmental and Social Considerations in Detailed Planning Survey (Word/1,021KB)
·Minutes of Meeting (PDF/728KB)
- - -
Pakistan Energy Sector Reform Program L 2010 B - - - -
Pakistan Energy Sector Reform Progtam (II) L 2010 B - - - -
Pakistan Khyber Pakhtunkhwa Rural Roads Improvement and Rehabilitation Project L 2010 B - - - -
Pakistan Transmission System Network Reinforcement Project in Islamabad and Burhan (Tarbela-Burhan-Islamabad Peshawar Road Substation) L 2010 B - - - -
Pakistan The Project for Flood Management Enhancement GA 2022 B - - - -
Pakistan The Project for Improvement of Water Treatment Plant and Water Distribution System in Faisalabad GA 2010 B - - - -
Pakistan Flood Damaged Road Rehabilitation Project L 2010 FI - - - -
Sri Lanka Container Terminals for Colombo South Harbor Development Project L 2010 A - - - -
Sri Lanka Moragahakanda Development Project L 2010 A ·EPC (Oct. 1, 2010) (PDF/935KB) ·EIA (Oct. 1, 2010) (PDF/80.1MB)
·RAP (Oct. 1, 2010) (PDF/36.5MB)
·TBA -
Sri Lanka New Bridge Construction Project over the Kelani River L 2010 A ·-Preparatory Survey Volume 1:Cover~5
·-Volume 1: 5~14
·-Volume 1: Appendix ; 1~4
·-Volume 1: Appendix ; 4~9
·-Volume 2: Cover~Plan
·-Volume 2: Profile~Substructure General Drawing
·-Volume 3: Cover~Vol.I
·-Volume 3: Vol.II
·-Volume 3: Vol.II
·-Volume 4: Cover~Appendix2
·-Volume 4: Appendix ; 2~3
·-Volume 4: Appendix 4~5
·-Volume 4: Appendix 5
·-Volume 4: Appendix 5
·-Volume 4: Appendix ; 5~10.2
·EIA (Nov. 1, 2013) (PDF/29.2MB)
·RAP(PDF/7.64MB) (PDF/7.64MB)
·Ex-Ante Evaluation (PDF/43.44KB) -
Sri Lanka Project for Establishment of New Light Rail Transit System in Colombo L 2010 A ·Preparatory survey on the project for establishment of new light rail transit system in Colombo final reprot (May. 31, 2018) ·RAPJuly. 24, 2018 (PDF/5.84MB)
·EPCJuly. 25, 2018 (PDF/8.04MB)
·EIAJuly. 25, 2018 (PDF/54.1MB)
·EIA(ADDENDUM) July. 25, 2018 (PDF/6.81MB)
·Environmental Review (PDF/144KB) ·Latest Monitoring Report (December 2019) (PDF/236KB)
Sri Lanka Traffic Improvement Project around New Kelani Bridge L 2010 A - - - -
Sri Lanka Feasibility Survey for Environmental Protective Slope Protection Technology Using GEOFIBER Method (Continuous Fiber Reinforced Soil Method) SDGs-SS 2010 B ·Final Report (in Japanese)(PDF/5.46MB) - - -
Sri Lanka Feasibility Survey for Incineration Treatment of Medical Wastes in Sri Lanka SDGs-SS 2010 B ·Final Report (in Japanese)(PDF/6.53MB) - - -
Sri Lanka Feasibility Survey for Introducing Self-treatment Type Flush Bio-toilet by Utilizing Oyster Shell SDGs-SS 2010 B ·final report in japanese - - -
Sri Lanka Feasibility Survey for manufacturing and development engineer personnel training program in the industrial education sector. SDGs-SS 2010 B ·final report in japanese - - -
Sri Lanka Verification Survey with the Private Sector for Disseminating Japanese Technologies for Municipal Solid Waste Material Recovery Facility SDGs-SS 2010 B ·Final Report (In Japanese) - ·Environmental Review (In Japanese) (PDF/169KB) ·Final Report (In Japanese)
Sri Lanka Verification Survey with the Private Sector for Disseminating Japanese Technologies for Pre-stressed Concrete Tanks for Water Supply and Sewage Treatment Systems in Sri Lanka SDGs-SS 2010 B ·Final Report (In Japanese) (PDF/16.6MB) - ··Environmental Review(Japanese) (PDF/142KB) ·Final Report (In Japanese) (PDF/16.6MB)
Sri Lanka Verification Survey with the Private Sector for Disseminating Japanese Technologies for Recycling Project of Organic Garbage and Agricultural Waste by Screw Type Composting Plant SDGs-SS 2010 B ·Final Report (In Japanese) ·Environmental Recommendation (Apr.6,2016) (PDF/192KB) ·Environmental Review(Japanese) (PDF/183KB) ·Final Report (In Japanese)
Sri Lanka Verification Survey with the Private Sector for Disseminating Japanese Technologies for Wastewater Treatment by Ozone Oxidation Method with Swirling Jet SDGs-SS 2010 B ·Final Report (In Japanese) (PDF/6.33MB) - ·Environmental Review(Japanese) (PDF/131KB) ·Final Report (In Japanese) (PDF/6.33MB)
Sri Lanka BOP business on water supply in non-supply areas TCP 2010 B - - - -
Sri Lanka Project for Formulation of Western Province Solid Waste Management Master Plan TCP 2010 B ·Detailed Planning Survey(April,19 2019) (PDF/963KB) - - -
Sri Lanka Project for Formulation of Western Province Solid Waste Management Master Plan TCP 2010 B - - - -
Sri Lanka Project for Flood Mitigation Master Plan for Colombo Metropolitan Region TCDP 2010 B - - - -
Sri Lanka Project on Generation and Transmission Master Plan Study TCDP 2010 B ·ESC in Detailed Planning Survey (PDF/865KB) - - -
Sri Lanka The Project for Formulating Cascade System Development Plan under North Central Province Canal TCDP 2010 B - - - -
Sri Lanka The Project for The Strategic Master Plan Under Sewerage Sector TCDP 2010 B ·Environmental and Social Considerations in Detailed Planning Survey(May.15,2015) (PDF/860KB)
·RD Sewerage MP(Aug.31,2015) (PDF/939KB)
- - -
Sri Lanka Urban Transport System Development Project for Colombo Metropolitan Region and Suburbs TCDP 2010 B ·Urban Transport System Development Project for Colombo Metropolitan Region and Suburbs-Final Report - - -
Sri Lanka Anuradhapura North Water Supply Project (Phase1) L 2010 B ·Preparatory Survey Volume 1(PDF/2.76MB)
·Volume 2(PDF/7.51MB)
·Volume 3(PDF/8.22MB)
·Volume 4: Cover~Drawings(PDF/10.5MB)
·Volume 4: Drawings(PDF/13.5MB)
- ·Environmental Review ·EIA/RAP (PDF/130KB)
Sri Lanka Anuradhapura North Water Supply Project Phase 2 L 2010 B ·Preparatory Survey Volume 1 (summary) (PDF/2.49MB)
·Volume 2 (main, cover - chapter 4) (PDF/4.10MB)
·Volume 2 (main, chapter 5 - chapter 10) (PDF/3.56MB)
·Volume 3 (appendix, cover - chapter 5) (PDF/4.44MB)
·Volume 3 (appendix, chapter 6 - chapter 7) (PDF/1.67MB)
·Supplemental Study (PDF/10.1MB)
- ·Environmental Review -
Sri Lanka Bandaranaike International Airport Development Project 2 (II) L 2010 B - - ·Environmental Review -
Sri Lanka Bandaranaike International Airport Development Project Phase2 L 2010 B - - ·Environmental Review -
Sri Lanka Feasibility Study for Cascade System Development Project in North Central Province L 2010 B - - - -
Sri Lanka Greater Colombo Transmission and Distribution Loss Reduction Project L 2010 B - - ·Environmental Review ·EIA (PDF/2.00MB)
Sri Lanka Greater Colombo Transmission and Distribution Loss Reduction Project Phase2 L 2010 B - - - -
Sri Lanka Habarana-Veyangoda Transmission Line Construction Project L 2010 B - - ·Environmental Review ·Result of Monitoring (PDF/1.65MB)
Sri Lanka Health and Medical Service Improvement Project L 2010 B ·Preparatory Survey(PDF/3.38MB) - ·Environmental Review (PDF/193KB) -
Sri Lanka Landslide Disaster Protection Project of the National Road Network L 2010 B - - ·Ex-Ante Evaluation ·Environment Monitoring (December 2019) (PDF/1.08MB)
Sri Lanka Landslide Disaster Protection Project of the National Road Network Phase 2 L 2010 B ·Preparatory Survey: Cover~Chapter10(PDF/9.77MB)
·Appendix1~Appendix4(PDF/6.95MB)
·Appendix4(PDF/10.86MB)
·Appendix4 site37~Appendix6(PDF/9.07MB)
- - -
Sri Lanka Major Bridges Construction Project of the National Road Network L 2010 B - - ·Ex-Ante Evaluation (PDF/244.66KB) -
Sri Lanka National Transmission and Distribution Network Development and Efficiency Improvement Project L 2010 B - - ·Environmental Review -
Sri Lanka National Transmission and Distribution Network Development and Efficiency Improvement Project (II) L 2010 B ·Preparatory Survey: Cover~Chapter 16(PDF/6.10MB)
·Annex 3.6~Annex 10.5-1(PDF/9.60MB)
·Annex 11.2-1~Annex 12.2-3(PDF/7.34MB)
- - -
Sri Lanka Preparatory survey for New Integrated Urban Public Transport System Introduction Project L 2010 B ·Preparatory survey 1/13(PDF/2.12MB)
·2/13(PDF/9.03MB)
·3/13(PDF/8.12MB)
·4/13(PDF/7.01MB)
·5/13(PDF/6.98MB)
·6/13(PDF/4.99MB)
·7/13(PDF/5.84MB)
·8/13(PDF/8.40MB)
·9/13(PDF/6.12MB)
·10/13(PDF/9.10MB)
·11/13(PDF/5.66MB)
·12/13(PDF/4.89MB)
·13/13(PDF/6.80MB)
- - -
Sri Lanka Project for Development of East Container Terminal in Colombo Port L 2010 B - - - -
Sri Lanka Rural Infrastructure Development Project (Northern Province, Eastern Province, North Central Province and Uva Province) L 2010 B - - ·Environmental Review(PDF/308KB) -
Sri Lanka Sri Jayawardenepura Kotte Sewerage Construction Project L 2010 B ·Preparatory survey: main report(PDF/8.03MB)
·additional study(PDF/4.24MB)
- - -
Sri Lanka Water Sector Development Project III L 2010 B ·The Preparatory Survey on Water Sector Development Project Ⅲ in the Democratic Socialist Republic of Srilanka Final Report Volume1 Executive Summary (June 19, 2015) (PDF/5.91MB) - - -
Sri Lanka The Project for Rehabilitation of Killinochchi Water Supply Scheme GA 2010 B ·Preparatory Survey Volume 1(PDF/2.84MB)
·Volume 2(PDF/2.93MB)
·Appendix 1(PDF/3.91MB)
·Appendix 2(PDF/3.31MB)
·Appendix 3(PDF/2.93MB)
- ·Environmental Review (In Japanese)(PDF/219.8KB) -
Sri Lanka The Project for the Improvement of Infectious Waste Management GA 2022 B - - - -
Sri Lanka Emergency Natural Disaster Rehabilitation Project L 2010 FI - - ·Environmental Review (PDF/100KB) -